Laserfiche WebLink
ITEM <br /> <br />PRELIMINARY CONSTRUCTION COST ESTIMATE FOR <br />CABARRUS COUNTY EXPO PARKING ~ NC 49 END-652 SPACES <br />NOTE: ESTIMATE PREPARED WITHOUT PLANS (SKETCH ONLY) <br /> <br />Clearing (*cannot be burned) <br />6.75-Acre portion of Site <br />2 Acres @ northeast end of site <br />Total <br /> <br />QUANTITY UNIT UNIT <br /> PRICE <br /> <br /> Ac <br />2 Ac <br />2 Ac $5,500.00/Ac <br /> <br />02-January-2003 <br /> <br /> COST <br /> <br />$11,000.00 <br /> <br />Mass Grading <br />6.75-Acre portion of site <br />Removal of Stockpile @ NC 49 <br />Unsuitable Soil (5% estimate) <br />Testing (Estimate) <br /> <br />15,000 Cy $1.75 ICy <br />25,000 Cy $6.50/Cy <br />750 Cy $6.50 ICy <br />1 Ls $5,000.00 Ls <br /> <br /> $26,250.00 <br />$162,500.00 <br /> $4,875.OO <br /> $5,000.00 <br /> <br />Storm Sewer <br />18" RCP pipe <br />24" RCP pipe <br />30" RCP pipe <br />cb's <br />fes' <br /> <br />Lf $20.00/Lf <br />Lf $24.00/Lf <br />Lf $32.OO/Lf <br />Ea $1,575.00 ea <br />Ea .$675.00 ea <br /> <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br /> <br />Parking Lots <br />stone base (6")/. asphalt (2") <br />fine grade road <br /> <br />Curb and gutter (24") <br />Backfill Curb <br /> <br />28,574 <br />28,574 <br /> <br />7,200 <br />7,200 <br /> <br />Sy $10.75/Sy $307,172.89 <br />Sy $0.50/Sy $14,287.11 <br /> <br />Lf $8.50/Lf $61,200.00 <br />Lf $1.50/Lf $10,800.00 <br /> <br />8. 5' Sidewalk <br /> <br />9. Seeding <br /> <br />10. Erosion control (7.5% of total) <br /> <br />11. Rock Allowance <br /> <br /> 0 <br /> <br /> 2 <br /> <br />200 <br /> <br />Lf $12.25/Lf $0.00 <br />Ac $1,500.00/Ac $2,250.00 <br /> $15,722.00 <br /> <br />Cy $60.00 ICy $12,000.00 <br /> <br />Expo Additional parking @ NC 49 end.xls <br /> <br />lof2 <br /> <br /> <br />