Laserfiche WebLink
12. Contingency - 10% <br /> <br /> subtotal : $633,057.00 <br /> $63,305.70 <br /> subtotal = $696,362.70 <br /> <br />TOTAL ESTIMATE - $696,362.70 <br /> <br />The construction estimate is based on current market values available for labor and <br />products as specified and may or may not I:)e accurate at the time of construction. The <br />estimate reflects assumptions made by Engineer on types of material, depths, and <br />capacities of structures that are impossible to determine accurately without complete <br />engineering plans approved by the various local, state, and federal regulatory agencies and <br />without complete subsurface investigation to discover the presence of rock or unsuitable <br />soil. This construction estimate does not reflect costs associated with land acquisition, right- <br />of-way acquisition, interests costs, soft costs, fuel increases, increases in insurance costs, <br />or costs associated with unusual weather delays or unusual government review time. This <br />estimate assumes availability on site of sufficient quantities of suitable materials for <br />construction. This construction estimate is based upon preliminary quantities and unit prices <br />from local contractors. Therefore, we assume no responsibility and shall have no <br />liability, consequential or otherwise, between the <br />projected cost and the actual cost incurred due to the regulating authorities, unanticipated <br />conditions, or changes in the owner's program or scope of services. <br /> <br />Expo Additional parking @ NC 49 end.xls <br /> <br />2of2 <br /> <br /> <br />