Laserfiche WebLink
ITEM <br /> <br /> PRELIMINARY CONSTRUCTION COST ESTIMATE FOR <br />CABARRUS COUNTY EXPO-PAVED OVERFLOW PARKING-381 SPACES <br />NOTE: ESTIMATE PREPARED WITHOUT PLANS (SKETCH ONLY.) <br /> 02-January-2003 <br /> QUANTITY UNIT UNIT <br /> PRICE COST <br /> <br />Clearing (*cannot be burned) <br />4.5-Acre portion of Site <br />Total <br /> <br />4.5 Ac <br /> <br />4.5 Ac $5,500.00/Ac $24,750.00 <br /> <br />Mass Grading <br />4.5-Acre portion of site <br />Unsuitable Soil (5% estimate) <br />Testing (Estimate) <br /> <br />2,500 Cy $1.75 ICy $4,375.00 <br />125 Cy $6.50 ICy $812.50 <br />1 Ls $2,500.00 Ls $2,500.00 <br /> <br />3. Storm Sewer <br /> 18" RCP pipe <br /> 24" RCP pipe <br /> 30" RCP pipe <br /> cb's <br /> fes' <br /> <br />1,000 Lf $20.00/Lf $20,000.00 <br />570 Lf $28.00/Lf $15,960.00 <br />125 Lf $32.00/Lf $4,000.00 <br />13 Ea $1,575.00 ea $20,475.00 <br />1 Ea $675.00 ea $675.00 <br /> <br />Parking Lots <br />stone base (6") / asphalt (2") <br />fine grade parking <br /> <br />16,700 Sy $10.75/Sy $179,525.00 <br />16,700 Sy $0.50/Sy $8,350.00 <br /> <br />5. Curb and gutter (24") <br /> Backfill Curb <br /> <br />3,880 Lf $8.50/Lf $32,980.00 <br />3,880 Lf $1.50/Lf $5,820.00 <br /> <br />6. 5' Sidewalk <br /> <br />7. Seeding <br /> <br />8. Erosion control (7.5% of total) <br /> <br />9. Rock Allowance <br /> <br />10. Contingency - 10% <br /> <br />Expo Overflow Paved Parking.xls <br /> <br />0 Lf $12.25/Lf $0.00 <br />1 Ac $1,500.00/Ac $1,500.00 <br /> $24,017.00 <br />250 Cy $60.00' ICy $15,000.00 <br /> subtotal- $360,739.50 <br /> $36,073.95 <br /> <br />lof2 <br /> <br /> <br />