My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2003 01 06 07
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2003
>
AG 2003 01 06 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 9:37:04 AM
Creation date
11/27/2017 11:39:58 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/6/2003
Board
Board of Commissioners
Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
subtotal = <br /> <br />TOTAL ESTIMATE = <br /> <br />$396,813.45 <br />$396,813.45 <br /> <br />The construction estimate is based on current market values available for labor and <br />products as specified and may or may not be accurate at the time of construction. The <br />estimate reflects assumptions made by Engineer on types of material, depths, and <br />capacities of structures that are impossible to determine accurately without complete <br />engineering plans approved by the various local, state, and federal regulatory agencies and <br />without complete subsurface investigation to discover the presence of rock or unsuitable <br />soil. This construction estimate does not reflect costs associated with land acquisition, right- <br />of-way acquisition, interests costs, soft costs, fuel increases, increases in insurance costs, <br />or costs associated with unusual weather delays or unusual government review time. This <br />estimate assumes availability on site of sufficient quantities of suitable materials for <br />construction. This construction estimate is based upon preliminary quantities and unit prices <br />from local contractors. Therefore, we assume no responsibility and shall have no <br />liability, consequential or otherwise, between the <br />projected cost and the actual cost incurred due to the regulating authorities, unanticipated <br />conditions, or changes in the owner's program or scope of services. <br /> <br />Expo Overflow Paved Parking.xls <br /> <br />2of2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.