My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2003 03 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2003
>
AG 2003 03 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 9:37:29 AM
Creation date
11/27/2017 11:40:30 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/17/2003
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sent By: BULLOCK SMITH & PARTNERS; 865 546 0495; 6-Mar-03 11:0lAM; Page 3 <br /> <br />Mike Downs <br />Mamh 5, 2003 <br />Page 3 <br /> <br />Task 1.2 <br /> <br /> Site Analvsis <br /> <br />A. Perform a cursory review of existing conditions. A formal report is not included as part of <br /> this contract, <br /> <br />B. Review of environment and utility issues are cursory in nature; no engineering studies are <br /> included in this proposal. <br /> <br />PHASE 2 - CONCEPT DEVELOPMENT <br /> <br /> Task 2.1 BS~P will develop up to two alternative concepts describing site enhancements and <br /> proposed facilities, including a scaled site plan describing those facilities. <br /> <br /> Task 2.2 Provide order of magnitude cost data for all alternatives based on national trends. A <br /> detailed cost estimate is not included as part of this contract. <br /> <br /> Task 2.3 Refine the midway description of improvements. <br /> <br /> Task 2.4 Discuss new programs, new ideas, and alternative layouts for various uses and events to <br /> be held on the new midway. <br /> <br /> Task 2.5 Coordination work session with the Study Committee. <br /> <br /> A. Review concepts. <br /> <br /> B. Select preferred concept or combination of concepts with input from the Study <br /> Committee. <br /> <br />PHASE 3 - FINAL CONCEPT <br /> <br /> Task 3.1 Develop refined concept design for the midway {minimum scale 1"=50'). <br /> <br />Staff <br /> <br />The key BS~P staff members who will work on his project are listed below: <br /> <br /> David L. Forkner, ASIA Principal in Charge <br /> Curtis E. Catron, ASIA Project Manager/Site Planner <br /> Kirby T, Tracy Intern <br /> <br />t.,~OATk~mmo~Dewzts&l ~w Couqty Pl~ed .g3.tl6.~ doe <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.