Laserfiche WebLink
8ant <br /> <br />By: BULLOCK SUITH & PARTNERS;I <br /> <br />Mike Downs <br />March 5, 2003 <br />Page 2 <br /> <br />Project Approach <br /> <br />Bullock, Smith a Partners, Inc <br />Agricultural Fair. With input a <br />review and assist in the refine <br />the workshop-based drawing, <br /> <br />Upon acceptance of the sche~ <br />Midway, we can serve as a s <br />the completion of constructior <br />do this work. <br /> <br />Master Plan Process - PhysJ <br /> <br />Our project approach for ti <br /> <br />Phase 1 - Research and A= <br />Phase 2 - Concept Develo <br />Phase 3 - Final Concept <br /> <br />The tasks to be undertake <br /> <br />PHASE 1 - RESEARCH AND Al <br /> <br />Task 1.1 Conduct~cb <br /> <br />We will provide y~ <br />and request that <br />include Items sucl <br /> <br />B. One member of th <br /> collection and site <br /> <br />C. We will evaluate <br /> <br />D. We request that <br /> <br />E. Discuss goals and <br /> <br />F. As part of the kic~ <br /> members, conces <br /> its design. <br /> <br />G. Review scope of ~ <br /> <br />865 546 0495; <br /> <br />6-Mar-03 11:00AU; <br /> <br />Page 2 <br /> <br /> BS~P) will act as planning consultants for the Caberrus County <br />d advice from the Client and the current Midway Operator, BSSP will <br />ient of the project program, develop a schematic layout plan based on <br />[nd provide overall concept design assistance or recommendations, <br /> <br />atic layout plan, if the Fair desires to proceed with construction of the <br />icial consultant to a civil engineer of choice to provide specific input for <br />]ocuments and will provide a separate proposal to the civil engineer to <br /> <br />~i Analysis and Planning <br /> <br /> scope of the work is divided into three phases. <br /> <br />dysis <br />nent <br /> <br />in each phase are outlined below. <br />~,LYSlS <br />f Meeting <br /> <br />~with one of our standardized lists titled "Items Needed for First Meeting" <br /> send those items to us prior to our first site work session. This will <br />as site topography, photos of the midway area, etc. <br /> <br />design team will meet in Concord for an intensive one-day data <br />~nalysis work session. <br /> <br />pacts of the proposed midway site. <br /> <br /> establish a Fairgrounds Study Committee with a chairman <br /> <br />~bjectives. <br /> <br />)ff mtg, we request the Client schedule meetings with those staff <br />onaires and midway operator that utilize the midway or have input into <br /> <br />schedule, contract, and final products with client. <br /> <br />L'~DA*rA~mme~DewmM · C~b~ul C~,~Y P/l~elal. ~ O'3,dOC <br /> <br /> <br />