My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2003 04 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2003
>
AG 2003 04 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 9:37:36 AM
Creation date
11/27/2017 11:40:41 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
4/21/2003
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A <br /> <br />PROCEDURES FOR APPROVING INDUSTRIAL <br />CONNECTIONS <br /> TO THE SANITARY SEWER SYSTEM <br /> <br />(1) <br /> <br />Once the industry has contacted the jurisdiction for a tie-in connection to discharge <br />non-domestic wastewater into the sanitary sewer system, the jurisdiction should review <br />the industry's request and determine whether they approve the wastewater discharge, <br />discharge location, sampling location, connection to sanitary sewer system, etc. The <br />Water and Sewer Authority of Cabarrus County (WSACC) should be informed in <br />writing of the jurisdiction's decision, questions and/or concerns. <br /> <br />(2) <br /> <br />After receiving approval from the jurisdiction, the industry should be instructed by the <br />jurisdiction to submit a completed Industrial User Wastewater Survey and Permit <br />Application to WSACC for review. If the jurisdiction does not have a copy of the <br />application, they should instruct the industry to contact WSACC's Pretreatment staff at <br />788-4164, ext. 12. <br /> <br />(3) <br /> <br />WSACC will review the application and determine whether the wastewater can be <br />accepted into the Rocky River Regional Wastewater Treatment Plant or Muddy Creek <br />Wastewater Treatment Plant. Upon this determination, WSACC will submit a letter to <br />the industry of the decision, with a copy forwarded to the jurisdiction. For connections <br />denied, the industry will be allowed to appeal the decision or request a hearing in <br />accordance with Section 4.2(H) of WSACC's Sewer Use Ordinance. <br /> <br />(4) <br /> <br />Once the proposed connection has been properly approved by both WSACC and the <br />jurisdiction, WSACC will determine whether the industry should be permitted and/or <br />included in the local pretreatment program. <br /> <br />(5) <br /> <br />WSACC will notify the industry of the f'mal determination and a copy of all <br />correspondence will be sent to the jurisdiction, in accordance with the Pretreatment <br />Agreement. <br /> <br />Note: These same procedures should be followed for additional connections to the sanitary <br /> sewer system from existing industries. <br /> <br />Updated: 6/18/02 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.