My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2003 07 28
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2003
>
AG 2003 07 28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 9:37:58 AM
Creation date
11/27/2017 11:41:38 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
7/28/2003
Board
Board of Commissioners
Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page -2- <br /> <br />Item#2- Midway - Additional paving needed <br />Cost- $7,219.00 <br />Explanation- Engineer left an area (approximately 20 x 50) at the rear of Gold Hall <br />designated to be a landscaped area. This area is surrounded by pavement and is isolated <br />from any other landscaped areas. <br />Consequences of not paving- Pedestrian flows will be disrupted and future maintenance <br />of landscaping materials will be needed. <br /> <br />Item #3 - (3) Additional Midway Service Connections <br />Cost- $39,219.57 <br />Explanation- Additional service connections are needed in the area that will be housing <br />our food/craft vendors not related to the carnival. They were not included in the original <br />plans because of miscommunications between the county staff and the engineers relating <br />to the high concentration of vendors and their needs in this area. <br />Consequences of not adding- several generators will have to be rented to accommodate <br />the number of food vendors akeady committed to be at the fair. <br /> <br />Item #4 - Gray water storage <br />Cost- $18,000.00 <br />Explanation- the gray water from the lower end of the midway area will have to be <br />pumped to the rear of the midway at a cost of approximately $70,000.00 or another <br />alternative will have to be found. The proposed alternative will allow for the storage of <br />this gray water at the above cost. The water will then have to be removed from the <br />storage area by truck. The proposed storage facility will permit the placement of a pump <br />at a later date if needed. This was not included in the original bid because the engineer <br />was waiting on comments from the North Carolina Department of Environmental Health <br />concerning their requirements for pump sizes. <br />Consequences of not adding storage- a pump station will have to be purchased <br />($70,000.00) in order to pump the material across the midway to a gravity line or the <br />lower end of the midway will not be able to use the sewer lines. <br /> <br />The project is progressing on schedule at this time. With the approval of these changes <br />tonight, all projected projects will be complete and in service for the upcoming fair. <br /> <br /> <br />