Laserfiche WebLink
10. <br /> <br />11. <br /> <br />Proposed Project Funding: <br /> <br />A. Total Project Cost $ 236,872.45 <br /> <br />B. Requested from RTP <br /> <br />$ 50,000.00 <br /> <br />C. Local 20% Share (Total from Schedule C) <br /> <br />$ 44,180.00 <br /> <br />Type of Project and Quantitative Measure <br />Check the type of project, and provide an estimate of the project length, the unit cost and an estimated <br />total project cost.) <br /> <br />Type of Project Unit of Measurement Unit Cost Total Cost <br /> <br />New Trail Construction (e.g., feet or miles) <br /> <br />Soil Surface <br />Crusher Run Surface <br />Asphalt Surface <br />Boardwalk <br />Steps <br />Bridges <br />Canoe Ramps <br />Canoe Piers <br />Floating Docks <br />Other <br /> <br />6200 linear feet (8 feet wide) <br /> <br />$ 35.61 LF $220,782 <br /> <br />Trail Construction/Renovation <br />for mobility-impaired <br /> <br />Trail Maintenance/Restoration <br /> <br />Soil Surface <br />Crusher Run Surface <br />Asphalt Surface <br />Boardwalk <br />Steps <br />Bridges <br />Canoe Ramps <br />Canoe Piers <br />Floating Docks <br />Other <br /> <br />Development of traitside and trailhead facilities <br /> <br />Restrooms <br /> Portable <br /> Permanent <br /> <br />Schedule B - Page 3 <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> <br />