Laserfiche WebLink
· X~nnapoti~ Line <br /> <br />JOE If. Eli I-TAr GR_~Di'.,FG CO., iS'C <br /> <br /> K4!~,.WAPOL£5-. NC 28081 <br /> <br />(704) 955-21¥1 <br /> <br />Charlotte Line (."00 3 7,"-5 7'80 <br /> <br />MARCH 8,20002 <br /> <br />Mr. Darrell Robeason <br />-Matthews Con,qruCrion Co. inc. <br />23 .°5 Perimeter'Poime P~l,-way, Suite 175 <br /> "' i '~""' ~ '"' <br />~ hat.one,. ,,. _8-¢.$ <br /> <br />Re: Cabarrus Cotmzy Exposition Pars. <br /> Cosr of Re'¢isions <br /> <br />Dear Darrell, <br /> <br />Listed below is a cost breakdown of the additional cost ~ssociated with the revised <br /> <br />drawSng$. <br /> <br />Revised drawings received February 28,2002 <br /> <br /> Demolition & replacement of curb <br />(Mready in place ar circle ~ive) <br />~,Fill ~o raise ~ades on drive to Hwy 49. <br /> Layout (restaking) <br /> <br />18" curb & gutter deleted <br /> <br /> 90 If' ~ 30.00 = S 2,700.00 <br /> <br /> 3575cy @ 3.00 = 510,734.00 <br /> 1 is ~ 1750.00=~ 1,750.00 <br /> <br /> SubTotal $15,184.00 <br />Credk 313 if @ 7.35 = S 2,,300.00 <br /> <br /> Total $12,884.00 <br /> Overhead co~ 15% S !,932.00 <br /> <br />To'ral additional oosr 514,$16.00 <br /> <br /> <br />