Laserfiche WebLink
MRR. 15.~00~ ~:~4PMMRTTHbN=~' ~ COHST HO.40B P.8/I0 <br /> <br />Kevis~d rlruwing~ received .'k~'ard~ 4,"002 <br /> <br />'l~.aised ~n'ades at Akpon rd ent:ance <br />Storm Drain~e added at entrance <br />Layout <br /> <br />507 cy ~ 3,00 = S 1:521.00 <br />1 ls @12,298.00= $12:2P.5.'0~ <br />1 ls ;~. 500.00=2 500.00 <br /> <br />Tota~ $i4,3 i9.00 <br />Overhead Cost 157~o $ 2,14.5.00 <br /> <br />ToTal additional co$~ S16,467.00 <br /> <br />This price does not include any revisions in the midway, waiting on final drawings in this <br /> <br />Revised drawings received 'March 4,2002 on the road widening alon.g Il'wy 49. <br /> <br />Traffi~control 1 Is @ 5,175.00=5 5, I75 O0 <br />Grading 1 ls ~ 13,59000 = S13,590.00 <br />Clearing 1 ls ~ 3,000.00= IS 3,000.00 <br /> <br /> 521,765.00 <br />Overhead cost 15% S 3,265.00 <br /> <br />Total addidona) cost S25,030.00 <br /> <br /> <br />