Laserfiche WebLink
1Kevi.~ed dra~ lags received March 4,2002 on the road 'widening along g.5¢o~ Road. <br /> <br />Tra~c c6mrol <br />Grading. <br />C!e~ring <br />Storm Drainage " <br />Demolition <br />Erosion Control ,~lowanfe <br />(no erosion shown on drawings) <br /> <br />1 15 ~ 15,700.00 = Sl5,700,00 <br />1 ls ~, _. 8.,.$...~_. 0.0 S55,$50.00 <br />1 1~ ,.~ 10,000.00 = SI0,000.00 <br />1 ]s ,~. 25,000 00 = $.~>,000.00. <br />Ils ~: 15,500.00=$15,500.® <br />1 ls ~ 20,000.00 -- $20,000.00 ~' <br /> <br />Total $145,050.00 <br />Overhead cos'~ 15% $ 21,757.00 <br />Original. allowance S 17,000.00 <br />(credit) <br /> <br />Total ~dition'al cost $149,807.00 <br /> <br />This price doe, not include any fence demolition or relocation, traffic control for any <br />work other than our scope of work, militieS relocatioa or demolition, sidewalks. <br /> <br /> <br />