My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2002 03 18 (Regular)
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2002
>
AG 2002 03 18 (Regular)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2006 5:01:03 PM
Creation date
11/27/2017 11:42:47 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/18/2002
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1Kevi.~ed dra~ lags received March 4,2002 on the road 'widening along g.5¢o~ Road. <br /> <br />Tra~c c6mrol <br />Grading. <br />C!e~ring <br />Storm Drainage " <br />Demolition <br />Erosion Control ,~lowanfe <br />(no erosion shown on drawings) <br /> <br />1 15 ~ 15,700.00 = Sl5,700,00 <br />1 ls ~, _. 8.,.$...~_. 0.0 S55,$50.00 <br />1 1~ ,.~ 10,000.00 = SI0,000.00 <br />1 ]s ,~. 25,000 00 = $.~>,000.00. <br />Ils ~: 15,500.00=$15,500.® <br />1 ls ~ 20,000.00 -- $20,000.00 ~' <br /> <br />Total $145,050.00 <br />Overhead cos'~ 15% $ 21,757.00 <br />Original. allowance S 17,000.00 <br />(credit) <br /> <br />Total ~dition'al cost $149,807.00 <br /> <br />This price doe, not include any fence demolition or relocation, traffic control for any <br />work other than our scope of work, militieS relocatioa or demolition, sidewalks. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.