Laserfiche WebLink
Mar 29 02 ll:51a <br /> <br />p.3 <br /> <br /> COST ESTIMATE <br />PHASE II ENVIRONMENTAL SITE ASSESSMENT <br />CENTRAL CABARR~S HIGH SCHOOL <br />CONCORD, NORtH.CAROLINA <br /> QORE Proposal No. 02029-P <br /> <br />Professional Services <br />Project Coordination, Field Services, and <br />Phase II Report Preparation <br /> <br />Drilling Services (subcontracted) <br /> <br />One day for geoprobe for soil and groundwater sampling to an <br />approximate depth of 25 feet each. Includes mobilization, <br />demobilization, steam cleaner <br /> <br />.L. aboratow Analyses ( 10-day Turnaround Time) <br />3 Soil Samples <br /> EPA Method 8260, MADEp, EPH, and'MADEP VPH · <br /> <br />1 Groundwater Sample <br /> EPA Method 601/602 Extended to MTBE, <br /> MADEP VPH, MADEP EPH, and Lead <br /> <br />Expenses <br />Mileage <br />Equipment-(PID) <br />Supplies <br /> <br /> Subtotal <br /> <br />TOTAL COST <br />(Assuming Groundwater Sampling) <br /> <br />$1,070.00 <br /> <br />$1,200.00 <br /> <br />$1,365.00 <br /> <br />25.00 <br />70.00 <br />30.00 <br /> <br />$ 125.00 <br /> <br />$3,760.00 <br /> <br /> <br />