My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2002 04 15 (Regular)
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2002
>
AG 2002 04 15 (Regular)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2006 5:01:10 PM
Creation date
11/27/2017 11:42:59 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
4/15/2002
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
p.2 <br /> <br />Central Cabarrus High Schooi-Phase II ServiCes <br />QORE Proiect No. 02029-P · <br /> <br />March 29, 2002 <br /> Pacje 2 <br /> <br />PROJECT BUDGET <br /> <br />Based on the proposed scope of services described above, QORE will perform the soil <br />sampling, groundwater sampling, and analytical testing for the referenced site for an estimated <br />cost of $3,760.00. If groundwater is not sampled, QORE will. perform the soil sampling and <br />analytical testing for an estimated cost of $3,455.00. These budgets will not be exceeded <br />without your prior authorization. <br /> <br />This proposal is based on standard laboratory tumaround time of 5 to 10 days. If requested, an <br />accelerated turnaround time can be utilized at additional cost. <br /> <br />SCHEDULE <br /> <br />We are prepared to mobilize the week of Apdl 1, 2002. The fieldwork will require 1 day to <br />complete. Following completion of the fieldwork, standard laboratory turnaround time is 5 to 10 <br />days. If requested, an accelerated turnaround time can be utilized at additional cost. We will <br />then prepare a formal repor~ detailing the sampling and analytical testing within 3 weeks after <br />authorization. Please inform us if your scheduling requirements require a modification to our <br />anticipated schedule. <br /> <br />AUTHORIZATION <br /> <br />If the proposed additional services are acceptable, please issue your standard purchase order. <br />.Verbal authorization is sufficient for scheduling purposes; however, we will require wdffen <br />authorization for insurance purposes. Please note that our payment terms are net 30 day.s from <br />the date of the invoice. <br /> <br /> CLOSURE <br /> <br />QORE. inc. appreciates this opportunity to be considered for the referenced work. <br />any questions or. require additional information, please contact us. <br /> <br /> Respectfully submitted <br /> QORE, Inc. <br /> <br /> - Matthew D. MOon <br /> Environmental Scientist <br /> <br /> · <br /> <br /> ~Br~nch Mana'~ar-/ <br /> <br />If you have <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.