Laserfiche WebLink
Expo Bud_ et <br /> <br />Construction <br /> <br />Matthews Construction <br /> <br />Original Contract <br />Change Order #1 <br />Change Order #2 <br />Change Order #3 <br />Change Order #4 <br />Change Order #5 <br />Change Order #6 <br />Change Order #7 <br />Change Order #8 <br />Change Order #9 <br />Change Order #10 <br />Change Order #11 <br />Change Order #12 <br />Change Order #13 <br />Change Order #14 <br />Change Order #15 <br />Change Order #16 <br />Change Order #17 <br />Change Order #18 <br />Change Order #19 <br />Change Order #20 <br />Change Order #21 <br />Change Order #22 <br />Change Order #23 <br />Change Order #24 <br />Change Order #25RA <br />Change Order #25RB <br />Change Order #26 <br />Change Order #26R <br />Change Order #26XX <br />Change Order #26XZ <br />Change Order #27 <br />Change Order #28 <br />Change Order #29A <br />Change Order #29B <br />Change Order #30 <br />Change Order #30R1 <br />Change Order #30R?. <br />Change Order #31 <br />Change Order #32 <br />Change Order #33 <br /> <br />approved <br />approved <br />approved <br />approved <br />approved <br />approved <br />approved <br />denied <br />approved <br />approved <br />approved <br />approved <br />approved <br />approved <br />denied <br />approved <br />denied <br />approved <br />denied <br />approved <br />approved <br />approved <br />approved <br />approved <br />approved <br />denied <br />denied <br />denied <br />denied <br />pending <br />approved <br />approved <br />pending <br />pending <br />withdrawn <br />withdrawn <br />withdrawn <br />N/A <br />approved <br />denied <br /> <br />216,166.00 <br /> <br />327,502.00 <br /> <br />15,765,200.00 <br />105,413.00 <br />8,650.00 <br />8,650.00 <br />65,674.0O <br />17,553.00 <br />55,981.00 <br />90,386.00 <br /> <br />180,674.00 <br /> 15,137.00 <br /> 16,479.00 <br /> 7O8,355.OO <br /> 527,606.00 <br /> 216,761.00 <br /> <br />47,317.00 <br /> <br />18,120.00 <br /> <br />113,403.00 <br />4,641.00 <br />0.00 <br />16,580.00 <br />115,802.00 <br />65,227.00 <br /> <br /> 26,922.00 <br />-123,523.00 <br /> <br />206,575.00 <br /> <br />(2% Cont. Fund. 309,122.00) <br />Unsuitable Soils <br />Inc. Load Cap. In Arena Ceiling <br />Inc. Load Cap. In Arena Ceiling <br />Acc. Add. Row of Seats/Arena <br />Inst. Add. Row of Seats/Arena <br />Design Req./Metal BldgJArena <br />Unsuitable Soils <br />Remove unsuitable soils off site <br />Unsuitable Soils <br />Des. Req./Add. Seats/Arena <br />Add. Stone Base/RV-Storage <br />Enclose Events Bldg./Livestock <br />Add. Suites to Arena <br />Unsuitable Soils <br />Site/W&S/Revisions <br />Add. Cable Ducts/Events Bldg. <br />Sediment Interceptors <br />Unsuitable Soils/Pond <br />Electric Powered Fire Pump <br />Diesel Powered Fire Pump <br />Erosion Control/Maint. Area <br />Lower Dam At Rear Of Pond <br />Pave RV Parking Lot <br />Pave Proposed Gravel Lots <br />Site Water & Sewer Revisions <br />Extend Water & FP to Prop. Maint. <br />Changes to Exhibit Hall (Gold Hall) <br />Changes to Exhibit Hall (Gold Hall) <br />Changes to Exhibit Hall (Gold Hall) <br />Changes to Exhibit Hall (Gold Hall) <br />Insulation of Roll Up Doors <br />Refund Capital Recovery Fee/Soils <br />Site Lighting <br />Site Lighting <br />Old Airport Road Revisions <br />Old Airport Road Revisions <br />Old Airport Road Revisions <br /> <br />Upstairs Seating <br />Midway Grading,Slope Drains <br /> <br /> <br />