My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2002 06 10 (Recessed)
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2002
>
AG 2002 06 10 (Recessed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2006 5:01:19 PM
Creation date
11/27/2017 11:43:28 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
6/10/2002
Board
Board of Commissioners
Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order 33R1 approved <br />Change Order 33R1A denied <br />Change Order #34 pending 1,960.00 <br />Change Order #35 pending <br />Change Order #36 approved <br />Change Order #37 pending 22,430.00 <br />Change Order #38 N/A <br />Change Order #39 approved <br />Change Order #40 approved <br />Change Order #41 approved <br />Change Order #42 approved <br />Change Order #43 denied <br />Change Order #44 approved <br />Change Order #45 pending -6,367.00 <br />Change Order #46 pending 7,183.00 <br />Change Order #47 approved <br /> <br />Total Pending Change Orders 568874.00 <br /> <br />Total Construction Contracts To Date <br /> <br />5,513.00 <br /> <br /> -8,489.00 <br /> <br />-32,892.00 <br />-33,800.00 <br />-42,680.00 <br /> -6,042.00 <br /> <br /> -6,166.00 <br /> <br />-2,494.00 <br /> <br />18,146,533.00 <br /> <br />Midway Grading/Berm <br />Slope Drains <br />Lower Ramp Wall <br />Upgrade Electrical Ser. Exhibit Hall <br />Remove Area of Rescue <br />W/S Modifications/CESI Changes <br /> <br />Eliminate Sidewalks from Parking <br />Eliminate Texture Asphalt Pave. <br />Eliminate Colored Concrete <br />Eliminate Split Faced BIk/Gallery <br />Eliminate Ticket Booth <br />Eliminate Floor Boxes in Arena <br />Eliminate Floor Drains/Arena <br />Door Revisions/Events Center <br />Eliminate conduitArena Fire System <br /> <br />Construction Budget <br />Total Cost to Date <br />Pending Items Under Consideration <br />Available Funds <br />2% Contingency Fund in Construction Bid <br />Total Available Funds <br /> <br />20,106,206.00 <br />18,146,533.00 <br />568,874.00 <br />1,399,799.00 <br />309,122.00 <br />1,699,921.00 <br /> <br />Add. Items Needed to Complete Project <br /> <br />Revisions to Events Center <br />Fencing <br />Communications/Data <br />Office/Meeting Building Upfit <br />Midway Plaza Paving/Entry Pylons <br />Site Landscaping <br />Signs <br />Finish Bleachers/Platforms <br />Midway Power and Lights <br />Total <br /> <br />Estimated Costs <br /> 50,000.00 <br /> 30,321.00 <br /> 125,000.00 <br /> 550,000.00 <br /> 200,000.00 <br /> 100,000.00 <br /> 300,000.00 <br /> <br />1,355,321.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.