My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2002 12 02
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2002
>
AG 2002 12 02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2006 5:01:59 PM
Creation date
11/27/2017 11:44:41 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/2/2002
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MATTHEWS <br /> <br />CONSTRUCTION CO.., INC. <br /> <br />2359 Perimeter Pointe Parkway, Suite 175 <br />Charlotte, NC 28208 <br />(Phone) 704-357-6095 <br />(Fax) 704-357-0590 <br /> <br /> II NO. 031R1 i <br />COST ISSUE/'PROPOSAL QUOTATION Ii , <br /> <br /> PROJECT: CABARRUS COUNTY EXPOSITION PARK <br />iQUOTE NO.: 031R1 <br /> <br />DATE QUOTED: 11/18/02 <br /> <br />TO: Tim Demmitt <br /> Overcash Demmitt Architects <br /> 1520 South Bird <br /> Charlotte, NC 28202 <br /> (Phone) 704-332-1615 (Fax) 704-332-0117 <br /> <br /> PROJECT NO.: C121 <br />ARCH. PROJECT NO.: 001476 <br /> <br /> DAYS ALLOWED <br /> FOR APPROVAL: 10 <br /> <br /> EXPIRATION DATE: 11/28/02 <br /> <br />REQUESTED EXTENSION <br /> OF TIME IN DAYS: 130 <br /> <br />DESCRIPTION: <br />To upfit of Meetings Building interior based on Architectural, Structural, Plumbing, Fire Protection, HeatingNentilation/Air <br />Conditioning and Electrical Drawings prepared by the architect and engineers. Also included in the General Construction, <br />Plumbing and Electrical required to install the kitchen equipment noted on drawings K1.0, K1.1, K1.2, K1.3 and K1.4. See <br />the attached sheets for clarifications and cost breakdown. <br /> <br />System requirements for kitchen equipment in the Concession Areas is not a par[ of the request. <br /> <br />SUBCONTRACTORS I VENDORS SUB I VENDOR WORK DESCRIPTION AMOUNT: <br /> <br />Meeting U~3fit See Attached Breakdown , $684,724 <br />Kitchen Equipment See Attached Breakdown $139,624 <br />SELF PERFORMED WORK <br /> <br /> APPROVAL <br /> <br /> ARCH: <br /> <br /> DATE: <br /> <br />OWNER: <br /> <br /> DATE: <br /> <br /> DISTRIBUTION <br /> <br />See fax list <br /> <br />SUBTOTAL: <br /> <br />FEE PERCENT: Jl 0% <br /> <br />TOTAL REQUEST AMOUNT: <br /> <br />$824,348 <br /> <br /> $0 <br /> <br />$8~4,348 <br /> <br /> $0 <br /> <br />j l $824,348 <br /> <br />j MATTHEWS CONSTRUCTION CO., INC. <br /> Signed By: <br /> <br /> Darrell Robertson, Project Manager <br /> <br /> Date: 11/18/02 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.