My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2002 12 02
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2002
>
AG 2002 12 02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2006 5:01:59 PM
Creation date
11/27/2017 11:44:41 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/2/2002
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MATTHEWS <br />CONSTRUCTION CO., INC. <br /> <br /> FAX AND MAIL <br /> <br />DATE: Monday, November 18, 2002 NO. OF PAGES: COR Backup with Fax <br /> <br />TO: Tim Demmitt, AIA <br /> Overcash Demmitt Architects <br /> 1520 South Blvd <br /> Charlotte, NC 28203 <br /> <br />PHONE NO.: 704-332-1615. <br />FAX NO.: 704-332-0117 <br /> <br />FROM: W. Darrell Robertson, P.E. <br /> Matthews Construction Co., Inc. <br /> 2359 Perimeter Pointe Parkway, Suite 175 <br /> <br /> Charlotte, NC 28208 <br />PHONE NO.: 704-357-6095 <br />FAX NO.: 704-357-0590 <br /> <br />PROJECT: C121 - CABARRUS COUNTY EXPOSITION PARK <br />SUBJECT: Change Order Request #031Rl <br /> U'pfit of the Meeting Building and Meeting Building Kitchen <br /> <br />ACTION REQUIRED: Respons ACTION DUE BY: 11/23/02 <br /> <br />Attached is Change Order Request #31R1 to upfit the Meetings Building included installation of systems <br />and structures relating to the Kitchen Equipment. <br /> <br />This revision includes the following items that the previous COR #031 had excluded: <br />1. Fiber Reinforced Plastic (FRP) wall panels are included in the Kitchen. <br />2. Allowances have been made for the support of the Kitchen Hood, <br />3. Allowance has been made for the ductwork to connect the hood to the roof mounted fans. <br />4. Curbs compatible with the roof have been included for mounting the roof top fans'(4 each). <br />5. HVAC equipment has been upsized to allow for the additional load placed on the building systems by <br />the kitchen equipment. <br />6. Allowance has been made for Wall blocking 'for attachment of equipment. The Kitchen Equipment. <br />Contractor shall be responsible for providing required locations for blocking. <br />7. Allowance has been made to duct the kitchen hood exhaust and supply to the rear elevation of the. <br />roof. <br />8. Fire rated assemblies are to be provided at the Boiler Room as noted on the'documents: No other <br />fire rated assemblies are noted. <br /> <br />Based on documents provided to date, we believe this proposal is complete for upfit 8f the Meetings <br />Building including installation of the Kitchen Equipment based on the attached notes. <br /> <br />Please advise if there are any questions. <br /> <br />CC: Mike Downs, Cabarrus County Governmental Center (Fax) 704-788-8831 <br /> Melvin Cline, Matthews Construction Co., Inc. (Fax) 704-262-7062 <br /> <br />IF YOU DO NOT RECEIVE ALL OF THE INDICATED PAGES PLEASE CALL <br /> OUR OFFICE IMMEDIATELY. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.