Laserfiche WebLink
Water and Sewer <br /> Utility Availability. <br /> <br />Bethel Elementary School <br /> <br />Water <br /> <br />Sewer <br /> <br />There is currently an 6" water main on Bethel School Road and an 8" on <br />Midland Road. These lines are part of a loop between Hwy, 601 and Hwy <br />24/27. <br /> <br />1 Pump Station (20 gallons per minute capacity) <br />5000 linear feet of 3" Force Main <br />1" Water Service <br />Tie to Manhole <br />Design, Pmmitting,' & Contract Administration <br /> <br />$55,000 <br />$35,000 <br />$1,200 <br />$1,000 <br />$15,000 <br /> <br />There are no projections the City of Concord has made to provide sewer to this site. <br />There has been some discussion regarding how the site could be served but no definite <br />plan is laid out. Base on the overall scope required to serve the site, gravity sewer is not <br />a cost effective method that the City would consider. Therefore, the only option available <br />would be to install a pump station. <br /> <br />Our cost analysis is based on two factor scenario #1 would require a force main to be <br />extended to the Wallace. This is'not the cost shown above. There would be a significant <br />difference in the length of the force main, potentially the pump station sizing and design <br />cost which would exceed the above estimate by $90,000. Scenario #2 anticipates gravity <br />sewer being installed by a developer (T.R. Harrell) to the intersection of Midland and <br />Bethel School Roads. This would allow for the pump station to be placed at the school <br /> <br /> <br />