My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2001 04 23
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2001
>
AG 2001 04 23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:51:28 PM
Creation date
11/27/2017 11:45:24 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
4/23/2001
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PlanninglArchlEnglSurveying (10%) <br /> Contingency (5%) <br /> Total Phase II <br /> <br /> 45,000.00 <br /> 22,500.00 <br />$ 517,500.00 <br /> <br />Total Project Cost <br /> <br />$2,047,807.00* <br /> <br />* Does not include roadway access from Stough Road. <br /> <br />In the Fiscal Year 1999-2000 and 2000-2001 budgets, the Cabarrus County <br />Board of Commissioners approved $307,220.00 for this project. On February 23, <br />2000, Concord Engineering and Surveying Company was hired to complete the <br />master site plan, grading plan, storm drainage, erosion control plan, <br />bidding/construction administration, and topographic survey for $49,829.00. <br />Another company was also hired to complete soil boring for a cost approximately <br />$2,400.00. The City of Concord handled the boundaries survey (estimated at <br />$5,900) at no cost to Cabarrus County. With the above expenses, the balance <br />available for general construction of the soccer complex is approximately <br />$250,000. <br /> <br />The following are potential options for this proposed project: <br /> <br />OPTION 1: .. <br />A. Construct all Project Elements in Phase I <br /> · Total Phase I Budget <br /> · LessBoard of Commissioners <br /> Approved Budget <br /> · Funds Required to Complete Phase I <br /> <br />(see attachment) <br /> $ 1,530,307.00 <br /> <br /> 250,000.00 <br />$ '1,280,307.00 <br /> <br />B. Phase II (FY 2001-2002) <br /> · Restroom/Concession Building <br /> <br />$ 230,000.00 <br /> <br />C. Phase Ill (FY2002-2003) <br /> <br />· Athletic Lights (4 fields) $ 287,500.00 <br /> <br /> OPTION 2: <br />A. Construct only Grading, Erosion Control, and Storm Drainaqe In Phase I <br /> · Total Phase I Budget $ ' 805,232.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.