Laserfiche WebLink
Stonewall Jackson Soccer Complex <br />Preliminary Cost Estimates - October, 2000 <br /> <br />Phase I <br /> <br />1) Grading <br />2) Erosion Control <br />3) Storm Drainage <br />4) Parking Lot "stone" <br />5) Turfing (Bermuda Sprigs) <br />6) Irrigation System <br />7) Chain Link (6' Fencing) <br />8) Irrigation Wells (2) <br />9) Irrigation Holding Pond <br />10)Utilities <br />11)Signage <br />12)Landscaping <br /> <br />Subtotal <br /> <br />Planning/Arch/Eng/Surveying (10%) <br /> Contingency (5%) <br /> Total Phase 1 <br /> <br />$565,902.00 <br />112,900.00 <br />21,400.00 <br />132,000.00 <br />132,000.00 <br />99,000.00 <br />67,500.00 <br />2O,000.00 <br />25;000.00 <br />120,000.00 <br />25,000.00 <br />10,000.00 <br />$1,330,702.00 <br /> <br /> 133,070.00 <br /> 66,535.00 <br />$1,530,307.00 <br /> <br />Phase II <br /> <br />1) Restroom/Concession Building <br />2) Athletic Lights (4 fields) <br /> Subtotal <br /> <br />200,000.00 <br />250,000.00 <br />450,000.00 <br /> <br /> <br />