Laserfiche WebLink
MEMORANDUM <br />Page 2 <br />July 16, 2001 <br /> <br />Other bidders on the project would have justification for a bid protest if the Beers Group were <br />awarded the bid under the circumstances. Re-bidding may produce a lower project cost, but there <br />is no guarantee. There will be a delay in timing of two +/- weeks to re-bid. <br /> <br />BID AWARD AND PROJECT BUDGET ORDINANCE (pending action taken by the Board on <br />Item 1) <br /> <br />A Project Budget Ordinance denoting intended sources of funding is provided for Board <br />action. (Budget Amendments as provided.) <br /> <br />The bid summary and project architect recommendations are provided for action. NOTE: <br />Selected alternatives do impact the bid award. <br /> <br />Co <br /> <br />The original project construction estimates developed in April by the architect are <br />included. Some elements of the project are not included in this phase of the bids. A <br />second phase of bidding will include the maintenance building and fencing along with <br />walkway construction. <br /> <br />(Specialty equipment/machinery for the project along with tables, chairs, etc. will also be <br />bid separately.) <br /> <br />COLOR SCHEME SELECTION - LARC <br /> <br />The consultant will present alternative color scheme choices for the County Commission's <br />review. You are to determine which scheme will be used for the project exteriors. Orders will <br />need to be placed early in the project to assure timely delivery of materials. <br /> <br />POTENTIAL RELOCATION OF EXHIBIT HALL BUILDING <br /> <br />Staff review inclusive of market analysis underway by Mark Chappuis indicates that we may <br />want to consider a shift in location for the 40,000 SF exhibit building to increase accessibility to <br />parking and put it closer to the event center. <br /> <br />Staff will present drawings depicting an alternative to the current proposal and estimated design <br />costs to accomplish the changes. Mark Chappuls has been reviewing all of the design elements <br />and feels strongly that the exhibit building offers significant use options (fee based) to warrant <br />serious consideration of relocating the building on site or as an alternative creating additional <br />parking closer to the exhibit building for accessibility. <br /> <br />We will present this information for your review and consideration. <br /> <br /> <br />