Laserfiche WebLink
9/21/00 MEETING WITH ENGINEERS <br /> <br />Non-conforming lots of record must be combined when two nc lots adjacent. <br /> · Section 13.12.1 Already changed. Eliminate Article 4.7.6 to complete change. <br /> <br />Must have sediment and erosion control plan approved within 60 days or preliminary invalid. · Section 9.1.6.7.1 Need to re-consider talk to Tony Johnson. <br /> <br />Permeable paving should be required. · Section 8.1.2.5. <br /> · Need to correct references in 8.1.2.5 - alternative requirements. <br /> <br />Floodplain fill issue. <br /> · Already changed to allow ~l from other areas but no net loss of storage. <br /> <br />Residential subdivision stormwater requirement. <br /> · Already eliminated/check 9.2 for non-residential - check C.5 for requirements. <br /> <br />Maximum parking standards in multi-family and general. · Explain multi-family max parking issue. <br /> <br />Rural type zoning and street standards for low density residential areas. <br /> · At what density should we require curb and gutter, sidewalks. Consider matrix, lot <br /> width. Consider it by district. <br /> <br />Cul-de-sacs and street design. Connectivity. <br /> · Cannot do nco-traditional design and preserve trees. <br /> <br />Tree retention. <br /> · Now "encouraged" in 3.2.7.6 but more closely controlled in TND. <br /> <br />Article 4.9.6.1. <br /> · Request to add engineers and surveyors to PUD project team. <br /> <br />Article 6.2.1.3 City instead of County. <br /> <br />Open space requirements. <br /> · List residential districts in Table 6.5-1. <br /> <br />Access to public properties. <br /> · Need to identify by sections that require this. <br /> <br />Valley gutter should be required. <br /> · It is permitted by need to determine who makes choice. <br /> <br />APF question about adequacy. At what point are developers alerted to inadequacy. <br /> <br />Phasing question about who deterrn/nes schedule and relation to APF. <br /> <br />/Lrticle 6. Table 6-11. Want construction plan processing time shortened from 45 days to 30. · Engineering staff disagree, but consider reduction to 30 days. <br /> <br /> <br />