My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2000 11 20
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2000
>
AG 2000 11 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 5:00:09 PM
Creation date
11/27/2017 11:48:07 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
11/20/2000
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV 10 '00 ll':34AM LEISURE & RECREATION COHCEPTS <br /> <br />Mr. Frank W. Clifton, Sr. <br />PrOposal No.~ 001003 R <br />Novea~ber 10, 2000 <br />Pa~e 3 <br /> <br />Task 2. ' · Color CoQrai.,,..orion and Finish o£Materials <br /> <br />LARC Will,be responsible for selection of Colors and finish of materials for all <br />on-site a!~iitcctural elements to include' the following items: <br /> .~. <br />· buildin~ exterior elevations; <br />· bml.' ,din~ interior elevations; <br />· bgjlding interior ceiling and flooring; <br />. .: b, ,uilding roofs; <br />· ;i s!~.fixtures, furnishings iud equipment; <br />· walkways in public areas. <br /> <br />LARC will specify and supply color design boards and detailed drawings, <br />when required, to acconiplish the design intent. A LARC r~resentaiive will <br />be on-site!periodically during the construction phase o£the project to ensure <br />that tlle, Crtiginal concept regarding design is provided by the vendors. <br /> <br />Task 3.'i '~. Art Direction/Creative Convrot!nspection <br />· v~iiiting and inspecting the project as often as the si~m~iflcant progress <br /> 0~.Work on the project requires or ~t special rcques~ by thc Owner. <br /> . In conjtmction with the architect, inspect the project for adhermu:e to <br /> tile quality model established in the programming phase. <br />· Reject any work on the project that does not conform to the creative <br /> design intent. <br />· Assist md work with Owner and architects regard!nfl interpretation of <br /> th~ workiu§ drawings as tltcy r¢Iate to thc Art Direction of the project. <br /> <br />Task 4. $i_~ and Cn:aphic Desi~ Package <br /> <br />· SLau Schedule - LARC will prepare a complete schedule (list of signs <br /> r~quired) along with the location of eacl~ sign shown on the Master <br /> Plar~ <br />· Si_tm Design Packltge - Once the sign schedule has been accepted, <br /> LARC will produce concept design drawings giving details and <br /> specifications for bidding and production of the, signs by a local sign <br /> company. LARC will also assist in the selection of a local si~n <br /> company to produce thc sigm, if requested by the Owner. <br /> <br />The OWner is responsible for actual sign producticn and installation costs. <br /> <br />P.3/S <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.