My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2000 12 18
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2000
>
AG 2000 12 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 5:00:34 PM
Creation date
11/27/2017 11:48:19 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/18/2000
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Renovations To First Union National Bank Building <br />57 Union Street South, Concord, NC <br /> Phase I <br /> <br />Phase I of the project is to include the following renovations to the 1923 <br /> <br />building: <br /> 1. <br /> 2. <br /> <br /> Remove asbestos containing materials from floors 2 through 5. <br /> Remove interior partitions, ceiling, cabinetry, electrical, HVAC, <br /> plumbing fixtures and equipment on floor 2 through 5. <br />3. Construct Lwo new stairways. <br />4. Repair deteriorated exterior brick wall surfaces. <br />5. Apply dampproo~ng to the basement wall adjacent to Means Ave. <br />6. Replace roof surface on I story addition behind the 1923 building. <br />7. Repsi~ terr~/-cotta coping on top of parapet wall. <br />8. Repsi~ and paint exterior cornice. <br /> <br />Cost Estimate <br /> <br />Asbestos Abatement <br />Asbestos Abatement Contract Administration <br />General Requirements <br />Site Work <br />Demolition <br />Demolition Clean-Up <br />Dampproof Basement w~]l on <br />Means Ave Side of Builell.g <br />Seal Painted Exterior Masonry Walls <br />Concrete <br />Masonry <br />Steel <br />Doors, Frames and Hardware <br />Replace Low Roof on One Story <br />behind 1923 Building <br />Repair Coping on 1923 Building <br />Repair and P~i~t Exterior Cornice <br />Standpipe(Rough-in Stair Section Only) <br />Electrical <br />Contractor Overhead & Profit <br />Permit <br />Bond <br />Architect & Engineer Fee <br />Total <br /> <br />$40,000.00 <br />$ 4,000.00 <br />$40,000.00 <br />$10,000.00 <br />$53,000.00 <br />$ 4,000.00 <br />$10,000.00 <br /> <br /> $40,000.00 <br /> $11,000.00 <br /> $77,000.00 <br /> $54,000.00 <br /> $ 7,000.00 <br /> $13,000.00 <br /> <br />$ 2,000.00 <br />$15,000.00 <br />$25,000.00 <br />$ 5,OOO.OO <br />SS0,000.00 <br />$ 1,000.00 <br />$ 6,000.00 <br />$3L000.00 <br />$498,000.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.