Laserfiche WebLink
8. Grant Agreement - Home owner must sign a completed grant agreement before funds <br /> can be used on their home, This grant agreement must be notarized by a properly <br /> authorized Notary. <br /> <br />9. Inspections - Agency shall fi.om time to time inspect work as it is being performed to <br /> insure that work is being properly performed. <br /> <br />A final inspection shall be performed aRer all work has been completed to insure that <br />all materials have been installed, and that work has been completed in a workman like <br />manner. Contractor will not be paid until work has been satisfactorily completed. <br />After final inspection homeowner will need to sign an "Owner Certificate of <br />Satisfaction~ form. Weatherization Coordinator will insure that th/s for~ii along with a <br />~Contractor's Release of Liens~ form is complete and signed. <br /> <br />10. Close Out Procedures - Agency will make a final inspection prior to the final <br /> contractor payment. <br /> <br />11. Agency will certify that all items in the work write-up have been satisfactorily <br /> completed. <br /> <br />12. Agency will insure that all Lien Waivers have been signed before final payment. <br /> <br />13 <br /> <br />Agency shall insure that all unspent funds committed to the repair/or modification of <br />the dwelling unit are either used for eligible work items through an addendum to the <br />work write-up or the grant balance is reduced to reflect the actual loan amount. <br /> <br />ATTEST: <br /> <br />Date <br /> <br />Page 5 <br /> <br />TITLE: <br /> <br /> <br />