Laserfiche WebLink
Mr. Evans <br />Page 2 <br />April 28, 1999 <br /> <br />Item A. 7 Capital Improvement Plan - WSACC has adopted a Capital Improvement Plan which <br />includes both phases of the Adams Creek Interceptor. The title page and table of contents of this <br />plan are attached. <br /> <br />[tent B. 7 Sewer Use Ordinance - WSACC has adopted a Sewer Use Ordinance that has been <br />previously accepted by the Construction Grants & Loan Section. Attached is a letter dated March <br />11, 1999 fi.om John R. Blowe to WSACC confirming acceptance. <br /> <br />Item B. 8 Capital Reserve Fund- WSACC has established a Capital Expansion Reserve. A copy <br />of the resolution will be transmitted in the near future. <br /> <br />· Item B. IO Sites Required - All sites necessary for this project are currently being obtained by <br /> WSACC. Site certificates will be provided when all fight-of-way is acquired. <br /> <br />In addition, Dewberry & Davis, the design engineer, has submitted final plans and specifications to <br />Cecil Madden of Construction Grants & Loans. <br /> <br />Please note that this project will eliminate two problem pump stations currently owned and operated <br />by the Town of Mt. Pleasant. Both of these stations are aged (over 50 years old) and have had <br />overflows. I've attached copies of correspondence between the Mooresville office of DENR and the <br />Town documenting one incident with the Summer Street pump station. <br /> <br />I trust this additional information will complete our application and that it and the supporting <br />documents will be processed. If you have any further questions or need additional information, please <br />do not hesitate to call Sandy Tripp of Camp Dresser & McKee (704-342-4546). <br /> <br />Respectfully, <br /> <br />County <br /> <br />FWC/dpl <br /> <br />Attachments <br /> <br />CC: <br /> <br />Mark Lambert, WSACC <br />Sandy Tripp, CDM <br /> <br /> <br />