My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1999 05 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1999
>
AG 1999 05 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 5:59:01 PM
Creation date
11/27/2017 11:49:13 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
5/17/1999
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
calculated by multiplying the gallons per day of flows times the cost of capacity per gpd <br />($4.4619 per gpd). <br /> <br />Section IV. Apartments <br /> <br /> For apartment residences, a separate CILF will be calculated based upon an analysis of <br />average flows per apartment unit compared to the 250 gpd used for an EDU. This charge will be <br />applied to new apartments based on the number of units identified on the building permit, <br />regardless of the meter size used to service a particular building or complex. Until this analysis <br />is complete, an estimate of 175 gpd (70% of an EDU) will be used for each apartment unit, <br />generating a fee of $780 per apartment unit. <br /> <br />Section V. Effective Date of Assessment of CRF and Septic System Policy <br /> <br /> All CRF's will be assessed at the time a Building Pemfit is issued and will be collected <br />by the Cabarms County Building Inspectors Office as part of the Building Permit process. <br />Building Permits will not be issued unless assessed CRF's have been paid in full. CRF's will be <br />assessed for all new customers that receive Building Permits effective July 1, 1999, that are <br />connected to a wastewater collection system. The CRF will not apply to any structures built <br />before July 1, 1999, and will not apply to structures built effective July 1, 1999, which have an <br />individual septic tank nitrification system. Any structure built after the effective date, which is <br />connected to an individual septic tank nitrification system and in the future obtains a Plumbing <br />Permit to connect to a wastewater collection system, will be required to pay the CRF at the time <br />the Plumbing Permit is obtained. <br /> <br />Section VII. Utilization of CRF's and CRF Ordinance <br /> <br /> The Finance Director shall administer the assessment of CRF's and shall ensure that the <br />Board is provided sufficient financial information to allow the setting of appropriate financial <br />policies. The Finance Director shall establish and maintain records, which are in agreement with <br />the Budget, the CRF Ordinance and the appropriate statutes of North Carolina. <br /> <br />Section VIII. Effective Date <br /> <br />This Ordinance shall be effective on and after July 1, 1999. <br />Adopted this 15th day of Aprit, 1999. <br /> <br />Water and Sewer Authority of Cabarrus County <br />North Carolina <br /> <br />By: ~"/~_. ,,'"'~ff., '~' <br /> Kennet~i-F. ' --Payne, Chairman <br /> <br />/f~TEST: . ~ <br /> <br />///a~le . Sr~all', Secretary <br />/~// (Seal) <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.