Laserfiche WebLink
CA BARR US / S. RO WAN <br />TRANSIT FEASIBILITY STUD Y <br />FINAL REPORT <br />(DRAFT) <br /> <br /> PREPARED FOR: <br />CABARRUS / SOUTH ROVe'AN <br />METROPOLITAN PLANNING ORGANIZATION <br />& <br /> NCDOT PI_~BLIC IRANSII DIVISION <br /> <br /> PREPARED B Y: <br />GANNETT FLEMING CORDDRY AND CARPENTER, INC. <br />ENGINEERS & PLANNERS <br />301 S. McDOXYELL ST. <br /> SUITE 914 <br /> CHARLOTTE, NC 28204 <br /> May 1999 <br /> <br /> <br />