Laserfiche WebLink
ATTACHMENT A: SCOPE OF SERVICES <br /> <br />Woolpert Contact <br /> <br />Andrew R. Pack, RLA, ASLA <br />(?04.525.6284) <br /> <br />Services <br /> <br />The Consultant will prepare topographic survey for use in preparing contract documents for the design of <br />a new picnic area which includes two picnic shelters (pre-engineered, 30'x30'), one volleyball court, one <br />basketball court, two horseshoe pit, a new access park road, a gravel walking trail system, accessible <br />parking lot, left-hand mm lane along Orphanage Road, landscaping, and misc. erosion control and <br />earthwork. The amenities as noted above may vary depending upon the available phase one construction <br />budget. The anticipated construction budget is $ 416,000.00 <br /> <br />This work will be performed in five phases as described in Paragraphs 1.1 through 1.5. In addition <br />Paragraph 2.1 identifies the services associated with Additional Services. <br /> <br />Topographic Survey <br /> <br />Woolpert will perform a topographic survey on the approximate +/- 24-acre phase one site on Orphanage <br />Road in Cabarms County, North Carolina. The topo will be performed at a 100' grid interval on the site <br />with a fifty (50) foot overlap on all sides and including cross sections every 50' along the roadway <br />fronting the site. The resulting map will depict one (1) foot contour intervals and shall contain the <br />following items: <br /> <br />Property Information (Record information) <br /> <br /> Bearings and distances and the appropriate curve data of all property lines of the site shah be shown. <br />· Any property comers tied into during the course of the topographic survey. <br />· Names and established widths of adjacent dedicated highways, streets, and alleys. <br />· North Arrow showing orientation to a bearing system. <br /> <br />Utility Information <br /> <br />Location of all sanitary and storm sewer manholes, catch basins and drainage culverts within survey <br />limits and/or to centerlines of streets surrounding property. The following information shail also be <br />included for the sewer system: <br /> <br />· Elevation of all sewer manhole (for planning purposes for phase two) and drain inlet rims. <br />· Elevation of aH sewer inverts at manholes and drain inlets. For manholes and inlets with multiple inlet <br /> and outlet pipes, relate invert to pipe with direction of flow. <br />· Locations, sizes, and materials of all sewer pipes. <br />· For storm or sanitary sewer pipes extending beyond the survey/property line, the location of the first <br /> <br />Woolpert Use Only <br />Reviewed As To Form: <br />Date: <br /> <br />Woolpert Professional Service Agreement <br />9/9/99 Cabarrus County, NC 6 PSA.3/9~ <br /> <br /> <br />