My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1999 12 20
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1999
>
AG 1999 12 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 6:02:48 PM
Creation date
11/27/2017 11:50:25 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/20/1999
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A: SCOPE OF SERVICES <br /> <br />Woolpert Contact <br /> <br />Andrew R. Pack, RLA, ASLA <br />(704.525.6284) <br /> <br />Services <br /> <br />The Consultant will prepare additional topographic survey for use m preparing contract documents for <br />phase two of North Cabarms Park which includes the design of a new restroom building (up to 900 SF <br />gross), one picnic shelter (pre-engineered, 30'x30'), a new access park road, a gravel walking trail <br />system, accessible parking lot, water and sewer utilities, landscaping, and misc. erosion control and <br />earthwork. The amenities as noted above may vary depending upon the available Phase Two construction <br />budget. The anticipated construction budget is $ 474,480.00 <br /> <br />This work will be performed in five phases as described in Paragraphs 1.1 through 1.5. In addition <br />Paragraph 2.1 identifies the services associated with Additional Services. <br /> <br />Topographic Survey <br /> <br />Woolpert will perform additional topographic survey on thc approximate +/- 10-acre Phase Two site area <br />on Orphanage Road m Cabarrns County, North Carolina. The topo will be tied to the existing topography <br />survey (prepared by Woolpert) and w/Il be performed at a 100' grid interval on the including spot lg-ade <br />shots and invert elevations of the existing manholes for the proposed lateral sanitary sewer. The resulting <br />map will depict one (1) foot contour intervals and shall contain property line infomtion, utility <br />information, and topographical features and information. In addition to the edge of woods, approximately <br />ten (10) substantial trees in key areas (that are to be saved during construction near the picnic shelter and <br />restroom building) will be located as field marked by the Woolpert's Landscape Architect. <br /> <br />CONSTRUCTION DOCUMENTS <br /> <br />1.1 <br /> <br />Schematic Design Phase <br /> <br />1.1.1 <br /> <br />The Consultant shall review with the Owner the improvement programs and budgets set <br />for this proposed portion of the second phase development as outlined master plan dated <br />August 13, 1999. <br /> <br />1.1.2 <br /> <br />Upon a thorough review of thc existing master plan information, the Owner shall provide <br />to the Consultant a written statement of any comments and possible design requirements <br />and or changes to be made by the Consultant to this construction document design <br />package. <br /> <br />Woo~pert Use Only <br />Reviewed As To Form: <br />Date: <br /> <br />Woolpert <br />12/9/99 <br /> <br />Professional Se~ice Agreement <br />Cabarrus County, NC <br /> <br />6 psA.3/99 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.