Laserfiche WebLink
Cabarrus C&D landfill & Recycling Center Job No. 98001 <br />Operations Plan 02/11/98 <br /> <br />necessary to stabilize the cover. <br /> <br />1.9 Waste Acceptance <br /> <br />The permit requirements for the C&D landfill will allow the facility to accept the following <br />waste types: <br />a. Land-clearin,q debds as defined in G.S. 130A-290, specifically, solid waste that is <br /> <br /> generated solely from land-clearing activities, such as stumps, trees, etc.; <br /> <br />b. Inert Debds defined as solid waste that consists solely of material that is virtually <br /> <br /> inert, such as brick, copcrete, rock and clean soil; <br /> <br />c. Asphalt in accordance with G.S. 130-294(m); and <br /> <br />d. Construction and demolition debris defined as solid waste resulting solely from <br /> <br /> construction, remodeling, repair of demolition operations on pavement, buildings, or <br /> other structures. <br /> <br />The Operations Manager shall notify the Division within 24 hours of attempt to dispose of <br />any other waste products. No hazardous, liquid, or infectious waste shall be accepted or <br />disposed of in the C&D landfill. <br /> <br />2.0 SITE OPERATIONS AND MAINTENANCE <br /> <br />2.1 Entxanceway <br /> <br />The entranceway as shown on the Site Plan will include a left-turn lane on Flowes Store <br />Road. The entrance will have one 12-foot wide entrance lane and tv¢2 12-foot wide exit <br />lanes. <br /> <br />An island will be placed between the entrance and exit lanes to better facilitate landfill <br /> <br /> <br />