Laserfiche WebLink
alley, williams, carmen & king, inc. <br /> <br /> BURLINGTON OFFICE <br /> <br />ENGINEERS & ARCHITECTS <br />p.o. box 1179 / 740 chapel hill road <br />burlington, north carolina 272 t 6 <br />telephone 336/226-5534 <br />fax 336/226-3034 <br /> <br /> KANNAPOLIS OFFICE <br /> <br />CONSULTING ENGINEERS <br />p.o. box 1248 / 207 south main street <br />kannapolis, north carotina 28082 <br />telephone 704/938-1515 <br />fax 704/938-6810 <br /> <br />GREENSBORO OFFICE <br />CONSULTING ENGINEERS <br />300 east wendover avenue, suite 403 <br />greensboro, north carolina 27401 <br />telephone 336/378-2754 <br />fax 336/378-2583 <br /> <br />October 9, 1998 <br />98515 <br /> <br />PLEASE REPLY TO: <br /> Kannapolis <br /> <br />Mr. Jonathan Marshall, Planning Director <br />Cabarrus County Planning Services <br />Post Office Drawer 707 <br />Concord, North Carolina 28026-0707 <br /> <br />Re: Corban Avenue Parking Facility <br /> <br />Dear Mr. Marshall: <br /> <br />As you are aware, we originally advertised the Corban Avenue Parking Facility for bids <br />on August 16, 1998, and were to receive bids on the project on September 8, 1998. Six <br />(6) Contractors requested plans on the project and no bids were received at the Bid <br />Opening. <br /> <br />The project was Readvertised for Bids on September 13, 1998, and a bid date was <br />scheduled for September 29, 1998, at 2:00 p.m. A total of five (5) Contractors <br />requested plans on this Contract the second time around. The following is the list of two <br />(2) bids received: <br /> <br />Corban Avenue Parking Facility <br /> <br />Contractor Base Bid Alt No.1 Alt. No.2 Alt. No.3 <br /> <br />Boggs Paving, Inc. $333,595.50 $12,500.00 $2,500.00 - $5,700.00 <br />Thomas Const. Co. $342,193.43 $ 5,700.00 $1,750.00 -$14,900.00 <br /> <br />The Base Bid includes the widening and street improvements to Corban Avenue and the <br />parking lot except for the items listed in the alternates. Alternate No. 1 includes the <br />installation of a drip irrigation system. Alternate No. 2. includes the installation of an <br />electrical service for the drip irrigation system, Springfest electrical outlets, and conduit <br />for future barrier gates and card reader. Alternate No. 3 is a deduct for the installation <br />of PVC Picket Fence in lieu of the Planter along the west property line. <br /> <br />LAURENCE A. ALLEY, RE, <br />FRANZ k. HOLT, RE. <br />JEFFERY D. MOODY, RE. <br />JAMES L COVINGTON, PE. <br />ROBERT J. GRILL, ASLA <br /> <br />HERBERT A. CARMEN, AIA <br />KENNETH D. STAFFORD, AIA <br />JEFFREY S. JOHNSON, AIA <br /> <br />DARRELL L. RUSSELL, RE. <br />MARK D. REICH, P.E. <br /> <br />G. WESLEY WEBB, P.E. <br />WAYNE B, PERRY, R.L.S, <br />KlM R. LILLY, R,L.S, <br /> <br /> <br />