My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1997 09 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1997
>
AG 1997 09 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 6:30:43 PM
Creation date
11/27/2017 11:54:23 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/15/1997
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U N R- R O H N, Construction Group <br /> <br />6718 W. Plank Road, P.O. Box 2000, Peoda, Illinois 61656 USA Phone: (309) 697-4400 <br /> <br />FAX: (309) 697-5612 <br /> <br />August 29, 1997 <br /> <br />Cabarrus County Government Center <br />Board of Commissioners Meeting Room <br />65 Church Street, South <br />Concord, NC 28026-0308 <br /> <br />Attention: Sherri Barnhardt, Purchasing Agent <br /> 704/788-9884 <br /> <br />BID OPENING DATE: September 2, 1997 (9:00 AM) <br /> Governmental Center <br /> <br />BIDDER: <br /> <br />UNR-ROHN <br />6718 W. Plank Road <br />Peoria, IL 61604 <br /> <br />QUOTATION: <br /> <br />K-PH-7869 (HF) <br /> <br />RADIO COMMUNICATION TOWER <br />CLARIFICATION COMMENTS <br /> <br />ROHN's UNIQUE 20 YEAR WARRANTY is provided with the purchase of the tower <br />together with installation of the foundations and tower. <br /> <br />ROHN's proposal includes Bid Bond in the amount equal to 5% of ROHN's proposal. <br /> <br />ROHN's proposal is based upon the 300' tower being designed based upon 80 MPH <br />basic wind speed per ANSI/EIA-222-F with a 1/2" radial ice. 25% wind reduction is <br />taken with the effects of 1/2" radial ice per the ANSI/EIA-222-F Standard. <br /> <br />ROHN's proposal is based upon the ANSI/EIA-222-F Standard only and does not <br />take in to consideration any other Federal, State or Local Ordinances unless these <br />documents have been submitted to ROHN. <br /> <br />Taxes: ROHN's proposal does not include sales tax within the quoted price as the <br />"Instruction to Bidders" specifically states the County will pay the applicable taxes <br />as shown, SEPARATELY, on ROHN's invoice. <br /> <br />6. "Estimated delivery after receipt of written Purchase Order": <br /> <br />Design and Documentation Drawings (Sealed by NC P.E.): <br />Shipment of Embedded Hardware (Foundation Installation): <br />Erection of the Tower: <br /> <br />1 - 2 Weeks <br />4 Weeks <br />6 - 8 Weeks <br /> <br />For purposes of tower design, ROHN has included all the two way antennas as being <br />equivalent to PD220 antennas and these antennas will be mounted individually on 6' <br />side arms at the elevations reflected in the customer's Bid Specifications. <br /> <br />Nearly Half a Century of Service to the Communications Industry <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.