C~b~us C~lty Pa~s ~ Recr~
<br />
<br />Athletic Complex Analysis
<br />
<br />Pfofes.sk)~al CMl Subsurl'ac, e
<br />Design Engineering Rock
<br />Services Services Exploration
<br />
<br />Topographic Limited
<br />SUl~ey Staking
<br />
<br />Materials/Contract Transportation
<br />Construction Cost Cost to Move Fuel for
<br />Estimate Landfleld Equip Landfill Equip Totals
<br />
<br />Total
<br />Constgu~tlon
<br />Estimates
<br />
<br />WW FLOWE
<br /> 6,850.0O
<br /> 7,444.00
<br />PHASE ~
<br />
<br />18 a~es
<br />
<br />WW FLOWE 5,183.00 6,044.00
<br />PHASE II
<br />(3 IteUs)
<br />
<br />FRANK USKE PARK 5,5(30.00
<br />
<br />WOLF MEADOW
<br />(4 fletds)
<br />
<br />5,500.00 8,684.00
<br />
<br />2,275.00 21,769.00 12,780.00
<br />
<br />2,275.00 7,562.40 9,815.00
<br />
<br />2,500.(~ 6,844.50 12,330.0D *
<br />
<br />2,500.00 12,424.00 15,232.00
<br />
<br />,~,~ FRANK LISKE PARK 5,50C).1~ 6,644.00 2,.5D0.00
<br /> (4 fields)
<br /> P _l~e_ _ I
<br /> 14 acres
<br />
<br /> FRANK LISKE PARK 5,5[30.00 5,844.00 2,500.00
<br /> (4 rinds)
<br /> Phase II
<br /> lOacms
<br />
<br />TOTAL
<br />FRANK LISKE PARK 11,0~O.00 12,488.00
<br />
<br />24acms
<br />
<br />5,323.00 12,330.00
<br />
<br />3,80C).00 6,850.00 *
<br />
<br />51 ~365.00
<br />63,G32.00
<br />
<br /> 15,250.00
<br /> 66:075.00
<br /> 81
<br />
<br /> 19,482.00
<br /> 99,2'/7.00
<br />
<br /> (Also Turf
<br /> Present
<br />Soccer
<br />
<br /> 17,050.00
<br /> 57.075.00
<br /> 74,125.00
<br />
<br />11,150.00
<br />39.975.Q3
<br />51,1 25.O0
<br />
<br />5,000.00 9,123.00 19,180.C]0 *
<br />
<br />28,200.00
<br />97.0r~0.00
<br />1~5,2~.00
<br />
<br />2,500.00
<br />2,500.00
<br />
<br />2,500.00
<br />
<br />1 ,__rJo0.O0 137,193.00 271 ,O29.i33
<br />
<br />1,000.O0 119,443.50 295,278.50
<br />
<br />1,000.00 147,117.00 3t7,318.00
<br />
<br />1,00O.OO 79,119.00 :239,254.00
<br />
<br />2,000.00 189,O41.00 53D,2t5.00
<br />
<br />Imgat~.
<br />(also system fo~
<br />present field)
<br />
<br />97,-_~3_ (33
<br />
<br />
<br />
|