Laserfiche WebLink
First Priority <br /> Frank Liske Park <br /> (4 Fields) Phase I <br /> 1. Engineering/Design Services $ <br /> 2. Grading/Materials/Construction/Turfing Costs <br /> 3. Irrigation Systems <br /> 4. Parking Lots (200 spaces) <br /> 5. Restrooms/Concession/Conference Building <br /> Total Phase I $ <br /> <br />Second Priority <br /> W.W. Flowe Park <br /> (6 Fields) Phase I <br /> 1. Engineering/Design Services $ <br /> 2. Grading/Materials/Turfing Construction Costs <br /> 3. Irrigation Systems <br /> 4. Parking Lots (200 spaces) <br /> 5. Restrooms/Concession/Conference Building <br /> Total Phase I $ <br /> <br />Third Priority <br /> Frank Liske Park <br /> (4 Fields) Phase II <br /> 1. Engineering/Design Services $ <br /> 2. Grading/Materials/Turfing and Construction Costs <br /> 3. Irrigation Systems <br /> 4. Parking Lots (200 spaces) <br /> Total Phase II $ <br /> <br />12,144.00 <br />97,778.00 <br />97,500.00 <br />80,000.00 <br />100.500.00 <br />387,922.00 <br /> <br />14,294.00 <br />122,899.00 <br />72,000.00 <br />80,000.00 <br />100.500.00 <br />389,693.00 <br /> <br />11,344.00 <br />67,775.00 <br />40,800.00 <br />80,000.00 <br />199,919.00 <br /> <br /> <br />