Laserfiche WebLink
MEMORANDUM <br /> <br />DATE: <br /> <br />OCTOBER 20, t995 <br /> <br />TO: <br /> <br />GARY HAHN, CHAIRMAN <br />CABARRUS COUNTY BOARD OF EDUCATION <br /> <br />FROM: <br /> <br />DENNIS YATES, YCA <br /> <br />REFERENCE: ROCKY RIVER ELEMENTARY SCHOOL <br /> <br />COMM. NO.: <br /> <br />95001.1~. , <br /> <br />SUBJECT: <br /> <br />UPDATE OF CHANGESAS REQUESTED BY PARKS & <br />RECREATION DEPARTMENT <br /> <br />The following will document the conversations held to date among our firm, <br />Steve Little and various members of the BCE concerning the requested <br />additions and changes for the Rocky River Elementary Project: <br /> <br />CHANGES TO P.E. ROOM TO A FULL-SIZE GYMNASIUM:' / <br /> <br />o At the request of Steve Little, we have developed a revised concept for <br /> a gymnasium component of the Elementary School. The original P.E. <br /> space.as designed for the WES facility was 4,059 s.f. Including the larger <br /> -basketball court, associated run-off areas, and bleacher seating for <br /> approximately 250 persons, the revised square footage is 8,659 s.f., or <br /> an increase of approximately 4,600 s.f. above the WES project. VinYl <br /> composition tile O/CT) will continue to be utilized for floorfng. <br /> <br />· The odginal cost as bid for the Westside Elementary Project far the P.E. <br />Room was $15i,847, which equates to approximately $37.41/s.f. <br />Because of additional bathrooms, longer spans of structural steel, etc., <br />we guesstimate that the cost per square foot will be $42. Therefore, <br />considering the 8,659 sf. x $42/sf, we expect [he bid for the gymnasium <br />to be approximately $363,678, ar a net increase of approximately <br />$212,000 above the Westside Elementary P.E. space. <br /> <br />Regarding fees to make the required changes, we originally guesstimated <br />a fee range of approximately $10,000 -$20,000 to Steve Little as required <br />to revise the existing cloned drawings and redesign the larger gym facility <br />as described above. This fee estimate was based on each discipline <br />involved with the project being required to redesign each component, <br />SL~;h as ~tru~tural, plumbing, mechanical, electrical, and civil. Our current <br />thinking is that we can hold the fee toiapproxima[efY $10~000'=$1,2;Q08,-~ <br />Efforts will be made towards this goal. <br /> <br /> <br />