My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1995 08 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1995
>
AG 1995 08 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:37:00 PM
Creation date
11/27/2017 11:57:40 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/21/1995
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To~ <br /> <br />Cabarrus County Board of Commissioners <br /> <br />Steve L. Little, Director <br />Cabarrus County Parks and Recreation Department <br /> <br />Subject: <br /> <br />Revised Planning Proposal and Estimated Budget for Lake Concord Park Master <br />Plan <br /> <br /> On June 22, 1995, the Cabarrus County Parks and Recreation Commission recommended <br />for Cabarrus County to prepare a detailed Master Plan for the Lake Concord properties site. A <br />professional consultant was to provide programming, site evaluation and assessment, preliminary <br />planning, final planning, budget preparation and phasing services. The consultant was also to <br />conduct public meetings to gather input from the citizens pertaining to future facilities and park <br />programs. The professional consultants fee for this task was approximately $35,000. <br /> <br /> On July 31, 1995, the Cabarrus County Board of Commissioners recommended for <br />Cabarrus County staff members to prepare the Parks and Recreation Master Site Plan for the <br />Lake Concord Properties. <br /> <br /> Steve L. Little, Parks and Recreation Director and Jerry Newton, Planning, Zoning, and <br />Building Inspection Director met several times to discuss elements required in the preparation ora <br />master site park plan. It was determined that Cabarrus County can jointly prepare the following <br />items required to complete the Master Plan: data collection (natural elements, soils and slopes, <br />cultural analysis, site suitability, etc.), site assessment, optional conceptual improvements plans, <br />written master plan report, public presentation, and public input meetings. Cabarrus County can <br />utilize resources/manpower from Cabarrus County's: Parks/Recreation, Planning/Zoning/Bldg. <br />Inspection, G.I.S. and Land Records. <br /> <br /> Cabarrus County needs assistance from a professional consultant group to provide two <br />elements in the master planning process: (1) graphic drawing of the final rendered master plan, <br />(2) preparing estimates of probable park contribution cost. The estimated fees for these two tasks <br />is approximately $7,500.00. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.