My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1995 08 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1995
>
AG 1995 08 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:37:00 PM
Creation date
11/27/2017 11:57:40 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/21/1995
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Owner will provide such legal, accounting and insurance <br />counseling services as may be required for the project. <br /> <br />In accepting this Proposal, the Owner accepts all parts thereof, <br />but performance of each part shall be initiated as directed by <br />the Owner in writing for each miscellaneous project. <br /> <br />The plans and specifications will be completed by the Engineer <br />within a reasonble time. If the Owner wishes to terminate this <br />contract before final plans and specifications are completed, the <br />Owner must inform the Engineer in writing to terminate all work <br />on the project. The Owner will pay the Engineer on an hourly <br />basis for all work completed. <br /> <br />Since the Engineer has no control over the cost of labor, <br />materials or equipment, or over the Contractor's methods of <br />determining prices, or over competitive bidding or market <br />conditions, the estimates of construction cost provided for <br />herein are to be made on the basis of his experience and <br />qualifications and represent his best judgment as a design <br />professional familiar with the construction industry, but the <br />Engineer cannot and does not guarantee that bids or the project <br />construction cost will not vary from cost estimates prepared by <br />him. <br /> <br />TO THE FULLEST EXTENT PERMITTED BY LAW, THE TOTAL <br />PROFESSIONAL LIABILITY IN THE AGGREGATE, OF ENGINEER AND <br />ENGINEER'S OFFICERS, DIRECTORS, EMPLOYEES, AGENTS AND <br />INDEPENDENT PROFESSIONAL ASSOCIATES AND CONSULTANTS, AND ANY OF <br />THEM, TO OWNER AND ANYONE CLAIMING BY, THROUGH OR UNDER OWNER, <br />FOR ANY AND ALL INJURIES, CLAIMS, LOSSES, SERVICES, THE PROJECT <br />OR THIS AGREEMENT FROM ANY CAUSE OR CAUSES WHATSOEVER, INCLUDING <br />BUT NOT LIMITED TO, THE NEGLIGENCE, ERRORS, OMISSIONS, STRICT <br />LIABILITY OR BREACH OF CONTRACT OF ENGINEER OR ENGINEER'S <br />OFFICERS, DIRECTORS, EMPLOYEES, AGENTS, OR INDEPENDENT <br />PROFESSIONAL ASSOCIATES OR CONSULTANTS, OR ANY OF THEM SHALL NOT <br />EXCEED THE TOTAL AMOUNT OF $250,000.00. <br /> <br />ACCEPTED BY OWNER <br /> <br />Jeffrey L. Barnhart <br />Chairman <br />Cabarrus County Commissioners <br />DATE: <br /> <br />ACCEPTED BY ENGINEER <br /> <br />W. E. Cochran, Jr.F ' <br /> <br />President <br />W. Ear~ Coc~hran & Son, <br />DATE: ~/~_~ <br /> <br />Inc. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.