My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1995 10 02
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1995
>
AG 1995 10 02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:37:24 PM
Creation date
11/27/2017 11:57:54 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
10/2/1995
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING REPORT FOR BIDS <br /> <br /> ON <br /> <br />PLANTATION PIPE LINE CO. ]~ELOCATION <br />AT <br /> <br /> CODDLE CREEK RESERVOIR <br /> <br /> SEPTEMBER 27, 1995 <br /> <br />I. DATE AND TIME OF BID OPENING: August 31, 1995, 2:00 PM EDT <br /> <br />II. <br /> <br />III. <br /> <br />LOCATION OF BID OPENINQ$: <br /> <br />Plantation Pipe Line Company <br />945 East Paces Ferry Road <br />Atlanta, GA 30326-1125 <br /> <br />REPORT SUBMITTED TO: County Commissioners, Cabarrus County, North Carolina <br /> <br />IV. <br /> <br />DESCRIPTION OF PROJEq:T: <br /> <br />The project includes the relocation of the existing Plantation Pipe Line Co. petroleum <br />facilities at the Coddle Creek Reservoir. Bids were solicited by invitation for two contracts. <br /> <br />Contract AFE 7193-0002 (Pipeline) includes the installation of two new pipelines with <br />control valves across the Reservoir and removal of the existing pipelines. Two alternate <br />methods of construction were included in the bid package. Alternate 1 included the Open <br />Trench method of construction, and Alternate 2 required replacement of the pipelines <br />through the use of directional drilling technology. <br /> <br />Contract AFE 7193-0003 (Earthwork) included clearing and grading the right,of-way and <br />the construction of two berms or causeways to work in conjunction with the Open Trench <br />method of construction. <br /> <br />The selection of the Contractor(s) would be on the basis of the lowest cost of the combined <br />lowest responsible bidders for Contract AFE 7193-0002, Alternate 1 (Pipeline-Open <br />Trench) and Contract AFE 7193-0003 (Earthwork) compared to the lowest responsible <br />bidder for Contract AFE 7193-0002, Alternate 2 (Pipeline-Directional Drilling). <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.