My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1994 01 18
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1994
>
AG 1994 01 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:30:45 PM
Creation date
11/27/2017 11:58:11 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/18/1994
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNTY also accepts responsibility for not providing sufficient area of planting <br />sites so that the entire 356 acres under contract could be planted in the 1992-1993 <br />planting season, and is therefore prepared to reimburse CONTRACTOR for expenses <br />incurred in preparation to plant the entire 356 acres during 1992-1993 planting <br />season, and reasonable additional expenses incurred to plant many sites one year later. <br /> <br /> 1. Areas to replant (93.31 acres, $80,463) This is based on the list of sites <br />COUNTY has designated to be replanted in the 1993-1994 planting season. Charges <br />are based on planting 726 trees and shrubs per acre on all sites (per the original <br />contract), except on specified sites to be replanted with 484 trees and shrubs per acre <br />because of higher survival of last year's trees on those sites (Table 1). <br /> <br /> 2. New areas to plant for 5 % surcharge (not planted last year - 80 acres, <br />$4~496). These are areas specified under the original contract but not available to <br />plant last year. The Borrow Pit site north of SR73 and west of the dam has little or <br />no topsoil and is not suitable for establishment of hardwoods. Therefore, if <br />COUNTY requires this site to be planted without addition of top soil, <br />CONTRACTOR is granted a waiver of the survival and growth warranty referenced <br />above. In further recognition of this special situation, COUNTY has directed that the <br />upland portion of this site be planted with fifty percent (50%) Virginia pine. <br /> <br /> 3. Planting cleared fringe areas for 40% surcharge (28 acres, $12,588). These <br />are areas which were not specified in the original contract and are now needed to <br />complete the required wetland acreage. They have been cleared with heavy <br />equipment and are therefore very rough, contain debris, loose muddy soil and are <br />generally less accessible than the original agricultural sites specified. <br /> <br /> 4. Trees purchased but not planted last year (90,750 seedlings, $13,612). <br />These were seedlings grown under contract for CONTRACTOR which could not be <br />planted because the sites were not available. <br /> <br /> 5. Planting the floodplain area at the Rocky_ River WWTP, (7630 3-gallon <br />potted saplings, $67,070). This is based on $11 per sapling installed and mapped, <br />minus a credit of $1124 per acre charged under last year, s contract. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.