Laserfiche WebLink
CABARRUS COUNTY PARKS AND RECREATION DEPARTMEI[ <br /> <br /> A.D.A PROPOSAL - BAKERS CREEK PARI~ - <br />Suppliment To The A.D.A Self Evaluation - De~emloer 1 992 <br /> <br />PHASE I <br /> <br />DESCRIPTION <br /> <br />ESTIMATED <br />TOTAL COST <br /> <br />CABARRUS COUNT <br /> <br />SHARE @ 55°/'0 <br /> <br />GRADING (Development ol~ Handicapped Parking 2,3(]0.00 1,265.00 <br /> Area, a 10' wide path from <br /> Concession Scald to the East end of the <br /> parking for.) <br /> <br />9,521.00 5,236.55 <br />1,150.00 632.50 <br />1,350.00 742_50 <br />750.00 412.50 <br />346.00 190.30 <br />238.00 130.90 <br />600.00 330.00 <br /> <br />16,255-00 <br /> <br />ASPHALT PAVING (Above mentioned areas) <br />SURVEYING (Above mentioned areas) <br />ENGINEERING (Above mentioned areas) <br />TIMBER WALL (at Handicapped Parking Area) <br />CONCRETE RAMP (at Handicapped Parking Area) <br />CONCRETE WALL (at Ramp) <br />'BRIDGE (Materials only) <br /> <br />PHASE I TOTALS <br /> <br />8,940.25 <br /> <br />pHASE II <br /> <br />DESCRIPTION <br /> <br /> ESTIMATED <br />TOTAL COST <br /> <br />CABARRUS COUN <br /> SHARE @ 55°/ <br /> <br />GRADING (Paving path from the East end of <br /> the parking tot to the Greenway) <br />ASPHALT PAVING (Above mentioned areas) <br />SURVEYING (Above mentioned areas) <br />ENGINEERING (Above mentioned areas) <br /> <br />1,700.00 935.00 <br /> <br />15,348.00 8,44.1.40 <br />650.00 357.50 <br />1,500.00 825.00 <br /> <br />PHASE Ii TOTALS <br /> <br />COMBINED TOTALS <br /> <br />NOTE: Phase I to be completed in FY 1993-94 <br /> Phase II to be completed in FY lg94-g5 <br /> <br />19s198.00 <br />35,453. O0 <br /> <br />10,558.90 <br />19s499.15 <br /> <br />' The Ja~cr to buitc~ ~e ~riacje irt Phase I wil! be provided by Re CaDarrus County Parks and <br />,, Recreation Oepartmen~ - Property Maintenance Division Staff. <br /> <br /> <br />