Laserfiche WebLink
Task 6 - System Cost Analysis <br /> <br />Based on the results of the preceding tasks, CDM will estimate the capital and operating costs the <br />selected compost facility size. Estimated capital and operating costs for a scenario including a <br />MSW composting facility as part of the total solid waste management system for Cabarms County <br />will be developed. The scenario will address the existing collection system, existing recycling <br />program, a MSW composting facility, and a landfill to accept the residuals. This cost estimate <br />will be compared to cost estimates assuming the County only proceeds with a new lined landfill. <br /> <br />Task 7 - Prepare Draft Final Report <br /> <br />CDM will prepare a draft final report conta'ming the information collected in Tasks I through 6. <br />CDM will produce and provide five copies of the draft final report to Cabarms County. <br /> <br />Task 8 - Prepare Final Report <br /> <br />Based on comments and questions to the draft final report, CDM will make County requested <br />additions and corrections and incorporate relevant comments into the final report. CDM will <br />produce and provide 10 bound copies and one single-sided unbound copy of a final report to <br />Cabarms County. <br /> <br />Task 9 - Presentations and Meetings <br /> <br />CDM staff will attend up to two meeting to present the report and respond to questions <br />concerning its content. These meetings may be scheduled at the convenience of the County. <br /> <br />The responsibility of oWNER as described in Section 3 of said Agreement are <br />amended and supplemented as follows: <br /> <br />Cabarms County will provide CDM with information conceming their waste quantities and waste <br />composition, as available. <br /> <br />e <br /> <br />The time period for the performance of ENGINEER's services as set forth in Section <br />4 of said Agreement are amended as follows: <br /> <br />CDM will deliver five copies of the draft final report (Task 7 above) within four weeks of the <br />receipt of a written notice to proceed and of all requested data. Tasks 8 and 9 will be complete <br />within ten weeks of the beginning of the work covered in this Amendment. <br /> <br />Page 3 of 4 <br /> <br /> <br />