Laserfiche WebLink
Section- <br />Evaluation and Recornmendatio~ <br /> <br />8.3.10 Regu/atory requirements <br />The technology must be capable of meeting aU regulatory and pe,mit <br />requirements. It must be able to ensure the protection of public health and ~_ <br />environment. <br /> <br />A facility could be constructed to meet these criteria. <br /> <br />8.3.11 Siting issues <br />Specific siting issues must be identified and evaluated. These issues are <br />closely related to environmental impacts and regulatory requirements. <br /> <br />If a facility were to be sited in the area it would need to be geographically <br />away from any population base. This would then mean that the majority of <br />the waste would need to be hauled significant distances from population <br />centers, i.e. its point of generation. <br /> <br />8.4 Recommendations <br />Based on the information compiled for the study, and the above evaluatior~ <br />factors, CDM does not recommend that Cabarrus County consider the <br />development of a MSW processing facility to manage the majority of their <br />MSW waste stream. -- <br /> <br />CDM Camp Dresser & McKee <br /> <br /> <br />