My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1994 11 07
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1994
>
AG 1994 11 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:34:08 PM
Creation date
11/27/2017 11:59:16 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
11/7/1994
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES - WATER & SEWER DISTRICT - AUGUST 1, 1994 <br /> <br /> The Board of Commissioners of Cabarrus County, as the governing board of <br />the Water and Sewer District of Cabarrus County, met in regular session at the <br />Governmental Center in Concord, North Carolina on Monday, August 1, 1994, at 4:30 <br />P.M. <br /> <br />Present - <br /> <br />Absent <br /> <br />Chairman: Jeffrey L. Barnhart <br />Commissioners: Arne L. Fennel <br /> Kenneth F. Payne <br />Vice-Chairman: Carolyn B. Carpenter <br /> Sue B. Casper <br /> <br /> Mr. Paul Watson, Engineer with HDR Engineering, Inc., presented the <br />Engineering Report on the bids received on June 15, 1994 for the Muddy CreekW~rrP <br />and Interceptor. The multi-prime bids could not be opened because there were <br />no bids for Contract B (Mechanical and Plumbing). However, since there were <br />three Contract S (Single Prime) bids, these bids were opened with the intent to <br />award on the basis of the lowest single prime bid. The submitted Contract A <br />(General) and Contract C (Electrical) bids were returned to the bidders unopened. <br />The Contract L (Line Work) bid of B.R.S., Inc., contained a minor math error of <br />$0.70 which was corrected to the figure presented below. The Contract S bid of <br />Concord Builders, Inc. contained a minor irregularity by omitting the name of the <br />manufacturer for the modular treatment units. The company has subsequently <br />provided a letter indicating that Davco should have been written into the space <br />provided. The bids were as follows: <br /> <br />Contract Bidder Total Bid <br />S Concord Builders $1,235,000.00 <br />S Gilbert Engineering Company $1,318,667.00 <br />S Haren Construction $1,349,000.00 <br />A Concord Builders Not Opened <br />A Dellinger, Inc. Not Opened <br />A Haren Construction Not Opened <br />A Gilbert Engineering Not Opened <br />A Powell Construction Not Opened <br />B No Bidders NA <br />C Watson Electric Not Opened <br />C Spence Electric Not Opened <br />L R.F. Shinn $ 794,935.50 <br />L Dellinger, Inc. $ 799,371.00 <br />L Gilbert Engineering Company $ 819,873.25 <br />L B.R.S., Inc. $ 891,600.45 <br /> Corrected <br />L Ramey, Inc. $1,259,494.50 <br /> <br />Note: Ail bidders are licensed North Carolina contractors and each <br />provided the required five (5) percent bid bond. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.