Laserfiche WebLink
HDREn~nee~ng, lnc. <br /> <br />BID TABULATION <br />MIDLAND/WALLACE ROAD WATER DISTRIBUTION FACIUTIES <br />CABARRUS COUNTY, NORTH CAROMNA <br /> <br />BID DATE: JANUARY 7, 1993, 2:OOPM <br /> <br /> CONTRACTOR: HICKORY SAND STATE UTlUTY RAMEY, INC. <br /> ADDRESS: HICKORY, NC MONROE, NC WINSTON-SALEM, NC <br /> LIC NO.: 2648 17793 9727 <br /> UNIT UNIT UNIT <br />NO. DESCRIPTION QUANTITY UNITS PRICE TOTAL PRICE TOTAL PRICE TOTAL <br />1 MOBIUZA'TION 1 LS $7,297.00 $7,297.00 $8,100.00 $8,100.00 $8,565.00 $8',505.00 <br />2 CLEARING AND GRUBBING I LS 300.00 300.00 600.00 600.00 500.00 500.00 <br />4 TIMBER SALE PROCEEDS 110 LF 13.00 1,430.00 28.00 3,080.00 28.00 2,750.00 <br /> UNCLASSIFIED EXCAVATION 16,950 LF 14.00 237,300.00 15.50 282,725.00 14.70 249,165.00 <br />5 BORROW EXCAVATION 1,300 LF 11.20 14,560.00 14.50 18,850.00 13.40 17,420.00 <br />6 ROCK SILTCHECK DAM 680 LF 10.20 6,936.00 13.50 9,180.00 12.30 8 ~.~ i <br />7 8-IN. GATE VALVES 15 EA 500.00 7,500.00 400.00 6,000.00 468.00 7,020.00 <br />8 6-IN GATE VALVES 3 EA 400.00 1,200.00 300.00 900.00 338.00 1,014.00 <br /> 9 FIRE HYDRANTS 18 EA 1,300.00 23,400.00 1,600.00 28,800.00 1,286.00 23,148.00 <br />10 2-IN AIR RELEASE VALVES 4 EA 600.00 2,400.00 775.00 3,100.00 850.00 3,400.00 <br />11 16' SCP BORED 107 LF 80.00 8,560.00 100.00 10,700.00 125.00 13,375.00 <br />12 12-3/4' SCP BORED 76 LF 70.00 5,320.00 65.00 6,460.00 75.00 5,700.00 <br />13 ASPHALT DRIVE REPLACEMENT 135 LF 12.00 1,620.00 13.00 1,755.00 10.00 1,350.00 <br />14 CONCRETE DRIVE REPLACEMENT 16 LF 20.00 320.00 45.00 720.00 30.00 480.00 <br />15 GRAVEL DRIVE REPLACEMENT 490 LF 1.25 612.50 5.00 2,450.00 3.50 1,715.00 <br />16 CREEK CROSSING I LS 5,000.00 5,000.00 6,000.00 6,000.00 31,098.00 31,098.00 <br />17 CULVERT CROSSING 1 LS 6,000.00 6,000.00 4,200.00 4,200.00 9,163.00 9,163.00 <br />18 RAILROAD CROSSING I LS 10,000.00 10,000.00 14,500.00 14,500.00 34,638.00 34,638.00 <br />19 SILT FENCE 2,900 LF 3.50 10,150.00 2.50 7,250.00 2.00 5,800.00 <br />20 GRAVEL CHECK DAM 62 EA 225.00 13,950.00 50.00 3,100.00 55.00 3,410.00 <br />21 TYPE A INLET PROTECTION 1 EA 200.00 200.00 ' 600.00 600.00 100.00 100.00 <br />22 SEDIMENT BASINS 2 EA 300.00 600.00 '700.00 1,400.00 300.00 600.00 <br />23 RIP RAP 90 SY 30.00 2,700.00 47.00 4,230.00 22.00 1,980.00 <br />24 STONE BEDDING MATERIAL 400 TN 12.00 4~800.00 15.00 6~000.00 15.00 6,000.00 <br /> <br />TOTAL BASE BID <br /> <br />$372,155.50 <br /> <br />$410,700.00 <br /> <br />G:\PAU LI\CABARRUS\WLRDBDTB.WK3 12-Jan-93 Page 2 <br /> <br /> <br />