Laserfiche WebLink
HDR Engineering, Inc. <br /> <br />BID TABULATION <br />MIDLAND/WALLACE ROAD WATER DISTRIBUTION FACILITIES BID DATE: JANUARY 7, 1993, 2:00PM <br />CABARRUS COUNTY, NORTH CAROMNA <br /> <br /> CONTRACTOR: RDR, INC. ; JIMMY LYNCH & SONS RF SHINN <br /> ADDRESS: STANFIELD, NC PILOT MOUNTAIN, NC CONCORD, NC <br /> UC NO.: 7287 7706 10580 <br /> UNIT UNIT UNIT <br />NO. DESCRIPTION QUANTITY UNITS PRICE TOTAL PRICE TOTAL PRICE ~ TOTAL <br />I MO61LIZATION I LS $6,353.00 $6,353.00 $7,000.00 $7,000.00 $7,106.61 $7,106.61 <br />2 PROJECT VIDEOTAPE DOCUM. I LS 500.00 500.00 500.00 500.00 390.00 390.00 <br />3 8-IN DIA. WATER PIPE CAT. V 110 LF 24.00 2,640.50 14.00 1,540.00 24.00 2,640.00 <br />4 8-IN. DIA. WATER PIPE CAT III 16,950 LF 11.40 193,230.00 13.35 226,282.50 10.51 178,144.50 <br />5 8-IN DIA. WATER PIPE CAT II 1,300 LF 11.00 14,300.00 14.00 18,200.00 9.80 12,740.00 <br />6 6-IN DIA. WATER PIPE CAT III 680 LF 10.00 6,800.00 14.00 9,520.00 8.75 5,950.00 <br />7 8-IN. GATE VALVES 15 EA 450.00 6,750.00 475.00 7,125.00 475.00 7,125.00 <br />8: 6-IN GATE VALVES 3 EA 350.00 1,050.00 400.00 1,200.00 310.00 930.00 <br />9 FIRE HYDRANTS 18 EA 1,300.00 23,400.00 800.00 14,400.00 1,900.00 34,200.00 <br />10 2-IN AIR RELEASE VALVES 4 EA 900.00 3,600.00 1,800.00 7,200.00 900.00 3,600.00 <br />11 16' SCP BORED 107 LF 85.00 9,095.00 90.00 9,630.00 200.00 21,400.00 <br />121 12-3/4' SCP BORED 76 LF 65.00 4,940.00 75.00 5,700.00 75.00 5,700.00 <br />13 ! ASPHALT DRIVE REPLACEMENT 135 LF 12.00 1,620.00 15.00 2,025.00 12.00 1,620.00 <br />14 CONCRETE DRIVE REPLACEMENT 16 LF 50.00 480.00 20.00 320.00 23.00 352.00 <br />11~ GRAVEL DRIVE REPLACEMENT 4.90 LF 1.50 735.00 5.00 2,450.00 5.00 2,450.00 <br />16 CREEK CROSSING I LS 14,000.00 14,000.00 7,000.00 7,000.00 7,632.20 7,632.20 <br /> CULVERT CROSSING I LS 7,300.00 7,300.00 5,000.00 5,000.00 8,787.00 8,787.00 <br />18: RAILROAD CROSSING 1 LS 15,900.00 15,900.00 5,000.00 5,000.00 25,600.50 25,600.00 <br />19 SILT FENCE 2,900 LF 2.00 5,800.00 1.70 4,930.00 4.00 11,500.00 <br />20 GRAVEL CHECK DAM 62 EA 30.00 1,860.00 50.00 3,100.00 200.00 12,400.00 <br />21 TYPE A INLET PROTECTION 1 EA 400.00 400.00 700.00 700.00 300.00 300.00 <br />22 SEDIMENT BASINS 2 EA 300.00 600.00 500.00 1,000.00 710.00 1,420.00 <br />23 RIP RAP 90 SY 25.00 2,250.00 40.00 3,600.00 35.00 3,150.00 <br />24 STONE BEDDING MATERIAL .4~0. TN 1.00 400.00 12.00 4,800.00 18.00 7,200.00 <br /> <br />TOTAL BASE BID <br /> <br />$324,003.00 <br /> <br />$362,437.31 <br /> <br />G:~AU LI\CABARR US\WLRDBDTB.WK3 12-Jan-93 Page I <br /> <br /> <br />