Laserfiche WebLink
TRAFFIC ANALYSIS REPORT <br /> JANUARY 15~ 1993 <br />PROPST PROPERTY DEVELOPMENT PLAN <br />SARAH W. LABELLE <br /> TRANSPORTATION PLANNER <br /> <br />The planned development for the Propst property includes parcels of different <br />land uses which will significantly impact traffic flows on the surrounding road systems. <br />Although this analysis is based on a maximum build-out condition which would extend <br />over a long period of time, it is necessary to consider possible current and future <br />needs for existh]g road improvement, expansions and new road links. <br />Trip generations for each of the four parcels in the development were calculated <br />using the Institute of Transportation En~neers (ITE) Trip Generation manual, 4th <br />Edition. The different land use categories include R-15 (single family residenffal), C-1 <br />(neighborhood commercial) and I-1 (light industrial) each wi~h a list of restricted land <br />uses. It is not known at this time what types of industry will be created in ~he <br />parcels, as the variety of listed uses has a great range of traffic impacts. W ha t <br />follows ~s a brief description and week-day trip generation of each land use category. <br /> The development plan calls for 312 single family residential lots in parcel A, the <br />north section of the property. Each housin~ unit is averaged at 10 trips/day yielding <br />approximately 3120 for the subdivision. The commercial land use is located immediately <br />south of the residential area. Trip ~eneration is based on a built upon area of 35% of <br />the 42.21 total acres. Allowing for parking and walk area, six structures at 1000 <br />square feet are calculated to generate approximately 6168 trips/day. The <br />industrial parcels are located in the southern half of the development. It ~s presumed <br />that there will exist two businesses in the eastern parcel and three in the southern <br />parcel for a total of five. Each has an average of 469 employees with an average of <br />3.016 trips/day for a total of 7073 trips. The total trips generated by the Propst <br />development plan has a potential of totaling to 16,361 trips/day. <br /> These ~rips will be distributed a]ong Concord Farms Rd. which is the "spine" <br />of the development, Weddington Rd., US29, a major access to the site and in the <br />future will include the proposed Westside Bypass. Figures 1 and 2 show the trip <br />distributions by total numbers as well an by percent. A summary of the traffic <br />impact, including recommendations, by each road is as follows: <br /> <br />US29 <br /> The design capacity of this road is 50,000 trips/day with a current average daily <br />traffic (ADT) of 15:500. The percent capacity at ~his rate is 31%. The ADT is <br />projected ~o be at 42,900 or 86% capacity by the design year 2020. The Propst <br />property's impact was included under the existing zoning and influenced this number. <br /> <br /> Based on the traffic generations projected for this proposed development, 60% <br />of the traffic will use US29 to access the property with 40% using Weddin~ton Rd. At <br />60% projection, the additional trips using US29 will be 9,817. With this addition of <br />trips the capacity at design year 2020 will be increased to 105%. <br /> It is clear ~hat road improvement (primarily intersection enhancement) is <br />indicated in the near future. The recommendation is to construct right and left turn <br />lanes into the site off US29 onto Concord Farms Rd. <br /> <br /> <br />