My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1993 12 20
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1993
>
AG 1993 12 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:18:10 PM
Creation date
11/27/2017 12:00:46 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
12/20/1993
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W. EARL COCHRAN & SON, INC. <br /> <br />191 Eastover Drive, SE <br />Concord, North Carolina 28025 <br /> <br />CONSULTING ENGINEERING <br /> <br />William E. Cochran, Jr., P.E. <br /> <br />(704) 782-1456 <br /> <br />MEMO <br /> <br />TO: <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />DATE: <br /> <br />John V. Witherspoon, <br />Bill Cochran ~~f <br /> <br />Howell Child Care Center, Inc. <br />CDBG Project No. 92-E-0012A <br />Sanitary Sewer Improvements <br /> <br />December 13, 1993 <br /> <br /> On Thursday, December 2, 1993 at 2:00 PM, we received 8 bids <br />for the construction of the Howell Child Care Center, Inc. <br />Project. This project included 5,700 feet of 8 and 12 inch <br />gravity sewer, a pump station on Morrison Road and 27,300 feet of <br />force main to the existing outfall along Back Creek on Pharr Mill <br />Road, thus eliminating the discharge of treated waste from the <br />Howell Center waste treatment plant into Caldwell Creek. <br /> <br /> The low bidder was R. F. Shinn Contractor, Inc. of <br />Concord, N. C. with a bid of $542,726.38 for the Base Bid (6 <br />inch force main) and $593,921.40 for the Alternate Bid (8 inch <br />force main). The Engineer's estimate was $537,000.00. I am very <br />pleased with the low bid, as well as the number of Contractors <br />bidding the project. Following is a list of the bidders and <br />their bids. <br /> <br />BIDDER <br /> <br />R. F. Shinn Contr. <br />RDR, Inc. <br />Dellinger, Inc. <br />Concord Builders, Inc. <br />Sanders Bros., Inc. <br />B.R.S., Inc. <br />Yates Construction Co., Inc. <br />Buckeye Construction Co. <br /> <br />RECOMMENDATION <br /> <br /> BASE BID <br /> <br />$542 726.38 <br /> 558 947.90 <br /> 591672.15 <br /> 604 703.50 <br /> 642 925.84 <br /> 652 588.75 <br /> 669 378.70 <br /> 772,993.45 <br /> <br />ALTERNATE BID <br /> <br /> $593,921.40 <br /> 611,515.60 <br /> 642,089.95 <br /> 668,243.50 <br /> 690,899.34 <br /> 693,831.50 <br /> 726,569.60 <br /> 843,498.75 <br /> <br /> We have not received final approval from the North Carolina <br />Department of Environment, Health and Natural Resources for the <br />project, but this is expected by December 20, 1993. We do have <br />approval from the Sedimentation and Erosion Control Division, the <br />Corps of Engineers and the Department of Transportation. <br /> <br /> There are three rights-of-way to secure and we anticipate <br />having them in hand sometime this month. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.