Laserfiche WebLink
36.01 <br /> <br />4. Bedroom #2 <br /> -install 1/2 sheetrock on ceiling and texture. <br /> -Repair all holes in walls <br /> -Remove and replace crown molding. <br /> -Paint walls, crown molding, baseboard and door casing. *Kiltz walls and <br /> molding before painting. <br /> -Replace door going out of bedroom into living room. <br /> <br />'Total 619.00 <br /> <br />5. Den <br /> -Install 1/2 sheetrock on ceiling and texture. <br /> -Remove and replace crown molding. <br /> -Paint baseboard, crown molding and door casing. <br /> -Replace closet door. Install new hardware. <br /> -Replace door leading into den. <br /> -Paint walls ( Owners choice of colors) <br /> -Paint curtain boxes <br /> <br />Total 749.00 <br /> <br />6. Bathroom <br /> - Texture ceiling. <br /> -Install new recessed medicine cabinet. <br /> -Install new vanity under existing sink. <br /> -Install new wax seal and T-bolts on water closet. <br /> -Find where tub is leaking and fix. <br /> -Patch wall and paint. <br /> -Caulk around tile as needed <br /> -New cold water handle on tub faucet. <br /> -Paint door casing. <br /> <br />Total 502.00 <br /> <br />7. Flooring <br /> -Install Dimension carpet color to be Moccasin #29 in master bedroom, <br /> bedroom 2, hall, living room and den. <br /> -Install luan and Preference Duet Pattern #36110 vinyl flooring in kitchen <br /> and bathroom. <br /> Total 2,o5o.oo <br /> <br />8.Heating System <br /> -Remove existing oil furnace. Leave existing duct work. <br /> - Install upflow gas heating system. Tie existing duct work into new <br /> furnace. <br /> 2 of 3 <br /> <br /> <br />